Developing a New Logistics Based Model and Pilot System for Construction
暂无分享,去创建一个
[1] Peter Nemeth. Application Possibilities of Artificial Neural Networks in the Construction Industry , 2014, 2014 International Conference on Computational Science and Computational Intelligence.
[2] Gábor Bohács,et al. Adaptive Simulation of Automated Guided Vehicle Systems Using Multi Agent Based Approach for Supplying Materials , 2014 .
[3] Ronie Navon,et al. A model for automated monitoring of road construction , 2005 .
[4] Rapıp Akbas,et al. Geometry-based modeling and simulation of construction processes , 2003 .
[5] Fernando Taracena Sanz,et al. THE VEHICLE ROUTING PROBLEM WITH LIMITED VEHICLE CAPACITIES , 2013 .
[6] Hans-Joachim Bargstädt,et al. Construction logistics planning by simulation , 2010, Proceedings of the 2010 Winter Simulation Conference.
[7] Diane Riopel,et al. A simulation framework for real-time fleet management in internal transport systems , 2012, Simul. Model. Pract. Theory.
[8] Jan Tulke,et al. 4D construction sequence planning – new process and data model , 2007 .
[9] Kenneth F. Reinschmidt,et al. Construction scheduling using Genetic Algorithm based on Building Information Model , 2014, Expert Syst. Appl..