PERT-type projects: time–cost tradeoffs under uncertainty

Factual and anecdotal evidence confirms that investments in projects are inherently risky, as most large projects fail to meet their on-time and on-budget objectives. In one KPMG survey, 67% of the companies said that their project management function was in need of improvement. To address this issue, we examine two currently used procedures for crashing the project completion time by additional budget and develop a new stochastic procedure for this purpose. We consider projects with various patterns of activities, where the randomness of their duration derives from external uncertainty, internal uncertainty or both and where the correlation between their actual cost and random duration is known. The objective is to optimize the budget allocation among project activities, i.e. to determine the optimized activity execution speeds. We aim to minimize the project budget or any chance-constrained project cost, subject to any chance-constrained project completion time. We conduct Monte Carlo comparisons of the relative efficiency of the alternative procedures for crashing the project completion time on PERT-type projects. Broad Monte Carlo simulations confirm that the newly developed procedure can be an efficient tool for project management.

[1]  Pierre N. Robillard,et al.  Technical Note - Expected Completion Time in Pert Networks , 1976, Oper. Res..

[2]  Salah E. Elmaghraby,et al.  On the fallacy of averages in project risk management , 2005, Eur. J. Oper. Res..

[3]  Z. Laslo,et al.  Minimal budget for activities chain with chance constrained lead-time , 2007 .

[4]  S. Elmaghraby On the Expected Duration of PERT Type Networks , 1967 .

[5]  R. Britney Bayesian Point Estimation and the PERT Scheduling of Stochastic Activities , 1976 .

[6]  Zohar Laslo,et al.  Activity time-cost tradeoffs under time and cost chance constraints , 2003 .

[7]  James E. Kelley,et al.  Critical-path planning and scheduling , 1899, IRE-AIEE-ACM '59 (Eastern).

[8]  D. Golenko-Ginzburg On the Distribution of Activity Time in PERT , 1988 .

[9]  Joseph J. Moder,et al.  Judgment Estimates of the Moments of Pert Type Distributions , 1968 .

[10]  S. Elmaghraby,et al.  Optimal Time-Cost Trade-Offs in GERT Networks , 1972 .

[11]  Richard M. Van Slyke,et al.  Letter to the Editor---Monte Carlo Methods and the PERT Problem , 1963 .

[12]  Luís Valadares Tavares,et al.  On the optimal management of project risk , 1998, Eur. J. Oper. Res..

[13]  Nicolai Siemens A Simple CPM Time-Cost Tradeoff Algorithm , 1971 .

[14]  Weng-Ming Chu,et al.  A new approximation algorithm for obtaining the probability distribution function for project completion time , 2007, Comput. Math. Appl..

[15]  Dimitri Golenko-Ginzburg A two-level decision-making model for controlling stochastic projects , 1993 .

[16]  D. R. Fulkerson A Network Flow Computation for Project Cost Curves , 1961 .

[17]  Y. Kwak,et al.  Project risk management: lessons learned from software development environment , 2004 .

[18]  Neil Hardie,et al.  The prediction and control of project duration: a recursive model , 2001 .

[19]  R. Serfling Approximation Theorems of Mathematical Statistics , 1980 .

[20]  D. Malcolm,et al.  Application of a Technique for Research and Development Program Evaluation , 1959 .

[21]  James E. Kelley,et al.  Critical-Path Planning and Scheduling: Mathematical Basis , 1961 .

[22]  Joseph J. Moder,et al.  Project Management with CPM and PERT , 1964 .

[23]  Van Slyke,et al.  MONTE CARLO METHODS AND THE PERT PROBLEM , 1963 .

[24]  UNCLASSIFIED EXPECTED CRITICAL PATH LENGTHS IN PERT NETWORKS , 2014 .

[25]  Terry Williams Criticality in Stochastic Networks , 1992 .

[26]  L. Valadares Tavares A stochastic model to control project duration and expenditure , 1994 .

[27]  Robert N. Charette,et al.  Large-Scale Project Management Is Risk Management , 1996, IEEE Softw..

[28]  Luís Vladares Tavares A review of the contribution of Operational Research to Project Management , 2002, Eur. J. Oper. Res..

[29]  J. E. Selvidge,et al.  ASSESSING THE EXTREMES OF PROBABILITY DISTRIBUTIONS BY THE FRACTILE METHOD , 1980 .

[30]  Amy Hing-Ling Lau,et al.  A simple and logical alternative for making PERT time estimates , 1996 .

[31]  Amir Azaron,et al.  Lower bound for the mean project completion time in dynamic PERT networks , 2008, Eur. J. Oper. Res..

[32]  Rainer Kolisch,et al.  PSPLIB - A project scheduling problem library: OR Software - ORSEP Operations Research Software Exchange Program , 1997 .

[33]  J. J. Martin Distribution of the Time Through a Directed, Acyclic Network , 1965 .

[34]  Salah E. Elmaghraby On criticality and sensitivity in activity networks , 2000, Eur. J. Oper. Res..

[35]  Ignacio E. Grossmann,et al.  The exact overall time distribution of a project with uncertain task durations , 2000, Eur. J. Oper. Res..

[36]  Bajis M. Dodin Approximating the distribution functions in stochastic networks , 1985, Comput. Oper. Res..

[37]  Bajis M. Dodin Determining the K Most Critical Paths in PERT Networks , 1984, Oper. Res..

[38]  James J. Solberg,et al.  The use of cutsets in Monte Carlo analysis of stochastic networks , 1979 .

[39]  Hagai Ilani,et al.  Minimizing task completion time with the execution set method , 2008, Eur. J. Oper. Res..

[40]  Pierpaolo Pontrandolfo,et al.  Project duration in stochastic networks by the PERT-path technique , 2000 .

[41]  Marvin D. Troutt On the Generality of the PERT Average Time Formula , 1989 .

[42]  G. Thompson,et al.  Critical Path Analyses Via Chance Constrained and Stochastic Programming , 1964 .

[43]  N. Metropolis,et al.  The Monte Carlo method. , 1949 .

[44]  William R. King,et al.  Subjective Time Estimates in Critical Path Planning--A Preliminary Analysis , 1967 .

[45]  J. Coppendale Manage risk in product and process development and avoid unpleasant surprises , 1995 .

[46]  William J. Abernathy,et al.  Subjective Estimates and Scheduling Decisions , 1971 .

[47]  Linda A. Macaulay,et al.  A review of existing models for project planning and estimation and the need for a new approach , 1996 .

[48]  Tetsuo Iida Computing bounds on project duration distributions for stochastic PERT networks , 2000 .

[49]  A. Ang,et al.  Analysis of Activity Networks under Uncertainty , 1975 .

[50]  Bajis M. Dodin,et al.  Bounding the Project Completion Time Distribution in PERT Networks , 1985, Oper. Res..

[51]  D. Vose Risk Analysis: A Quantitative Guide , 2000 .