Natural hazard risk depending on the variability of damage potential
暂无分享,去创建一个
[1] C. Benson,et al. Understanding the Economic and Financial Impacts of Natural Disasters , 2004 .
[2] Johann Stötter,et al. Development of avalanche risk between 1950 and 2000 in the Municipality of Davos, Switzerland , 2004 .
[3] Rudolf Sailer,et al. Empirical Estimate Of Vulnerability RelationsFor Use In Snow Avalanche Risk Assessment , 2004 .
[4] M Edwin. “Avalanche risk assessment a multi temporal approach, results from Galtür, Austria“, de M. Keiler, R. Sailer, P. Jörg, C. Weber, S. Fuchs, A. Zischg, and S. Sauermoser , 1970 .
[5] Andreas Paul Zischg,et al. Uncertainties and fuzziness in analysing risk related to natural hazards: a case study in the Ortles Alps, South Tyrol, Italy , 2004 .
[6] Andreas Paul Zischg,et al. Avalanche risk assessment – a multi-temporal approach, results from Galtür, Austria , 2006 .
[7] Michael Bründl,et al. Damage Potential and Losses Resulting from Snow Avalanches in Settlements of the Canton of Grisons, Switzerland , 2005 .
[8] Robert S. Chen,et al. Natural Disaster Hotspots: A Global Risk Analysis , 2005 .
[9] Andreas Paul Zischg,et al. Temporal variability of damage potential on roads as a conceptual contribution towards a short-term avalanche risk simulation , 2005 .
[10] Andreas Paul Zischg,et al. Avalanche related damage potential - changes of persons and mobile values since the mid-twentieth century, case study Galtür , 2005 .
[11] Andreas Paul Zischg,et al. The long-term development of avalanche risk in settlements considering the temporal variability of damage potential , 2005 .
[12] Christian Wilhelm. Wirtschaftlichkeit im Lawinenschutz , 1996 .