A BIM-based framework for lift planning in topsides disassembly of offshore oil and gas platforms
暂无分享,去创建一个
[1] Andy Ju An Wang,et al. Path Planning for Virtual Human Motion Using Improved A* Star Algorithm , 2010, 2010 Seventh International Conference on Information Technology: New Generations.
[2] Eduardo Miranda,et al. Planning and visualization for automated robotic crane erection processes in construction , 2006 .
[3] Xiangyu Wang,et al. Applicability of 4D modeling for resource allocation in mega liquefied natural gas plant construction , 2015 .
[4] Louis Brzuzy,et al. Innovative Assessments for Selecting Offshore-Platform-Decommissioning Alternatives , 2015 .
[5] Roxanne Evering,et al. An ant colony algorithm for the multi-compartment vehicle routing problem , 2014, Appl. Soft Comput..
[6] Stefan T. Orszulik. Environmental technology in the oil industry , 1997 .
[7] Paul M. Teicholz,et al. BIM for facility managers , 2013 .
[8] Xiangyu Wang,et al. A State-of-the-Art Review on the Integration of Building Information Modeling (BIM) and Geographic Information System (GIS) , 2017, ISPRS Int. J. Geo Inf..
[9] Nashwan Dawood,et al. Construction workspace management within an Industry Foundation Class-Compliant 4D tool , 2015 .
[10] Chimay J. Anumba,et al. A framework for 3D traffic noise mapping using data from BIM and GIS integration , 2016 .
[11] Stephen P. Truchon,et al. Innovative Assessments for Selecting Offshore Platform Decommissioning Alternatives , 2015 .
[12] Salman Azhar,et al. Building Information Modeling (BIM): Trends, Benefits, Risks, and Challenges for the AEC Industry , 2011 .
[13] Hissam Tawfik,et al. Path planning in construction sites: performance evaluation of the Dijkstra, A*, and GA search algorithms , 2002, Adv. Eng. Informatics.
[14] Darrell Whitley,et al. A genetic algorithm tutorial , 1994, Statistics and Computing.
[15] Mohamed Al-Hussein,et al. Automating motion trajectory Of crane-lifted loads , 2014 .
[16] Yichuan Deng,et al. Automatic Transformation of Different Levels of Detail in 3D GIS City Models in CityGML , 2015, Int. J. 3 D Inf. Model..
[17] Robert John Lark,et al. BIM for infrastructure: An overall review and constructor perspective , 2016 .
[18] Jack C. P. Cheng,et al. A BIM-based system for demolition and renovation waste estimation and planning. , 2013, Waste management.
[19] Mohsen Andayesh,et al. A Comparative Study of Different Approaches for Finding the Shortest Path on Construction Sites , 2014 .
[20] Frank Schultmann,et al. Building Information Modeling (BIM) for existing buildings — Literature review and future needs , 2014 .
[21] Luis Moreno,et al. The Path to Efficiency: Fast Marching Method for Safer, More Efficient Mobile Robot Trajectories , 2013, IEEE Robotics & Automation Magazine.
[22] Chimay J. Anumba,et al. Mapping BIM schema and 3D GIS schema semi-automatically utilizing linguistic and text mining techniques , 2015, J. Inf. Technol. Constr..
[23] Ming Gu,et al. The IFC-based path planning for 3D indoor spaces , 2013, Adv. Eng. Informatics.
[24] Marco Pavone,et al. Fast marching tree: A fast marching sampling-based method for optimal motion planning in many dimensions , 2013, ISRR.
[25] Yusuf Arayici,et al. Building Information Modelling (BIM) for Facilities Management (FM): The Mediacity Case Study Approach , 2012, Int. J. 3 D Inf. Model..
[26] David Mitchell. 5D BIM: CREATING COST CERTAINTY AND BETTER BUILDINGS , 2012 .
[27] Olivier Lavialle,et al. Consideration of obstacle danger level in path planning using A* and Fast-Marching optimisation: comparative study , 2003, Signal Process..
[28] Jack Chin Pang Cheng,et al. Analytical review and evaluation of civil information modeling , 2016 .
[29] Brock Bernstein,et al. A multi‐attribute decision analysis for decommissioning offshore oil and gas platforms , 2015, Integrated environmental assessment and management.
[30] Tae Wook Kang,et al. A study on software architecture for effective BIM/GIS-based facility management data integration , 2015 .
[31] Hesham Osman,et al. A hybrid CAD-based construction site layout planning system using genetic algorithms , 2003 .
[32] Wen-Jing Hsu,et al. Automated stowage planning for large containerships with improved safety and stability , 2010, Proceedings of the 2010 Winter Simulation Conference.
[33] Nan Li,et al. Application Areas and Data Requirements for BIM-Enabled Facilities Management , 2012 .
[34] Gi Wook Cha,et al. A Study on the Establishment of Demolition Waste DB System by BIM-Based Building Materials , 2014 .
[35] Chimay J. Anumba,et al. Mapping between BIM and 3D GIS in different levels of detail using schema mediation and instance comparison , 2016 .
[36] Edsger W. Dijkstra,et al. A note on two problems in connexion with graphs , 1959, Numerische Mathematik.
[37] Rung Ching Chen,et al. An artificial bee colony algorithm for data collection path planning in sparse wireless sensor networks , 2013, International Journal of Machine Learning and Cybernetics.
[38] Jack Chin Pang Cheng,et al. A BIM-based automated site layout planning framework for congested construction sites , 2015 .
[39] Nils J. Nilsson,et al. A Formal Basis for the Heuristic Determination of Minimum Cost Paths , 1968, IEEE Trans. Syst. Sci. Cybern..
[40] Jack Chin Pang Cheng,et al. A financial decision making framework for construction projects based on 5D Building Information Modeling (BIM) , 2016 .
[41] J. D. Aplevich,et al. Computation of time-optimal trajectories for tower cranes , 1995, Proceedings of International Conference on Control Applications.
[42] Saad H.S. Al-Jibouri,et al. GENETIC ALGORITHMS FOR CONSTRUCTION SITE LAYOUT IN PROJECT PLANNING , 2002 .
[43] Jianda Han,et al. Survey of Robot 3D Path Planning Algorithms , 2016 .
[44] M. S. Liew,et al. Decommissioning of offshore platform: A sustainable framework , 2012, 2012 IEEE Colloquium on Humanities, Science and Engineering (CHUSER).