Design of a Lean and Agile Construction System for a Large and Complex Mechanical and Electrical Project

This paper represents “work-in-progress” as part of a collaborative research project being undertaken at the Centre for Innovative Collaborative Engineering for an Engineering Doctorate at Loughborough University, UK. The programme is funded by the EPSRC and is sponsored by a major UK mechanical and electrical contractor (the sponsor company). The project will have specific objectives, which will be capable of making a significant contribution to the performance of the company. The sponsor company is developing a “construction system” in order to improve the performance of its projects, and earlier research in this field has shown that lean interventions, when applied to a case study project, has had positive results. This paper describes the next phase of the development of the construction system, and proposes a lean and agile production system model which is to be implemented on a major private finance initiative (PFI) hospital development, and in particular the mechanical and electrical (M&E) elements. The model builds upon a “leagile” concept developed from manufacturing theory, and shows how the need for leanness and agility depends upon a total supply chain and labour strategy.

[1]  Mohamed Mohamed Naim,et al.  Selecting The Right Strategy To Meet Customer Requirements , 2000 .

[2]  Alistair G.F. Gibb,et al.  What Should You Really Measure If You Want to Compare Pre-fabrication with Traditional Construction? , 2005 .

[3]  Peter Fredriksson,et al.  Mechanisms and Rationales for the Coordination of a Modular Assembly System: The Case of Volvo Cars , 2006 .

[4]  Danny Berry,et al.  Leagility: Integrating the lean and agile manufacturing paradigms in the total supply chain , 1999 .

[5]  D. Towill,et al.  Engineering the leagile supply chain , 2000 .

[6]  Chris I. Goodier,et al.  Barriers and opportunities for offsite in the UK , 2005 .

[7]  Christine Pasquire,et al.  Design for Manufacture and Assembly , 2003 .

[8]  M. Naim,et al.  Developing Lean and Agile Supply Chains in the Uk Housebuilding Industry , 1999 .

[9]  D. Simchi-Levi Designing And Managing The Supply Chain , 2007 .

[10]  John Messner,et al.  Using Buffers to Manage Production: A Case Study of the Pentagon Renovation Project , 2003 .

[11]  Karl T. Ulrich,et al.  Product Design and Development , 1995 .

[12]  Alistair G.F. Gibb,et al.  'Lean' as an Antidote to Labour Cost Escalation on Complex Mechanical and Electrical Projects , 2005 .

[13]  Christine Pasquire,et al.  Leaner Construction Through Off-Site Manufacturing , 2002 .

[14]  Glenn Ballard,et al.  Kanban in Construction , 2003 .

[15]  Lauri Koskela,et al.  Context of Production Control in Construction , 2005 .