Determining the Relationship between Direct Work and Construction Labor Productivity in North America: Four Decades of Insights

AbstractLabor productivity in construction has fallen behind other industries in most of the world and has declined continuously for decades in the United States. To change this, the construction i...

[1]  David Arditi,et al.  Trends in productivity improvement in the US construction industry , 2000 .

[2]  H. Randolph Thomas,et al.  Games People Play with Work Sampling , 1982 .

[3]  D. Cramer The Sage dictionary of statistics , 2004 .

[4]  Bon-Gang Hwang,et al.  Improving labour productivity in process construction maintenance and shutdown/turnaround projects , 2018, International Journal of Construction Management.

[5]  Jie Gong,et al.  Effectiveness of craft time utilization in construction projects , 2011 .

[6]  Janaka Y. Ruwanpura,et al.  Carpentry workers issues and efficiencies related to construction productivity in commercial construction projects in Alberta , 2006 .

[7]  Adnan Enshassi,et al.  Labor productivity measurement in building projects , 2011 .

[8]  Robert D. Logcher,et al.  Management Impacts on Labor Productivity , 1978 .

[9]  Martin Fischer,et al.  Integrating Project Delivery , 2017 .

[10]  Søren Wandahl,et al.  Towards Identifying Making-Do as Lead Waste in Refurbishment Projects , 2018, 26th Annual Conference of the International Group for Lean Construction.

[11]  David P. Doane,et al.  Measuring Skewness: A Forgotten Statistic? , 2011 .

[13]  H. Randolph Thomas,et al.  Work Sampling Programs: Comparative Analysis , 1980 .

[14]  Paul. Olomolaiye,et al.  Problems influencing craftsmen's productivity in Nigeria , 1987 .

[15]  Mostafa E. Shehata,et al.  Towards improving construction labor productivity and projects’ performance , 2011 .

[16]  A. Price,et al.  Construction process performance variability: Focus on labour productivity , 1996 .

[17]  Luis F. Alarcón,et al.  Investigating the relationship between planning reliability and project performance , 2007 .

[18]  Søren Wandahl,et al.  Feedback Loop—The Missing Link in Activity Analysis , 2020 .

[19]  Alexander Laufer,et al.  Motivating Construction Workers , 1982 .

[20]  Paul M. Goodrum,et al.  An analysis of construction productivity differences between Canada and the United States , 2014 .

[21]  James L. Jenkins,et al.  Productivity improvement through work sampling , 2004 .

[22]  Perry Forsythe Extending and operationalizing construction productivity measurement on building projects , 2018 .

[23]  S. Peer An improved systematic activity sampling technique for work study , 1986 .

[24]  Aminah Robinson Fayek,et al.  A Research Framework for Work Sampling and its Application in Developing Comparative Direct and Support Activity Proportions for Different Trades , 2012 .

[25]  H. Randolph Thomas Can Work Sampling Lower Construction Costs , 1981 .

[26]  Graham Winch,et al.  Benchmarking on-site productivity in France and the UK: a CALIBRE approach , 2001 .

[27]  Mohamed Abdel-Wahab,et al.  Trends of productivity growth in the construction industry across Europe, US and Japan , 2011 .

[28]  V. K. Handa,et al.  Forecasting productivity by work sampling , 1989 .

[29]  Mohan M. Kumaraswamy,et al.  A study of the factors affecting construction durations in Hong Kong , 1995 .

[30]  Bilal Ayub,et al.  Labor Productivity Assessment Using Activity Analysis on Semi High-Rise Building Projects in Pakistan , 2017 .

[31]  Yogendra Kumar,et al.  Productivity Analysis of Small Construction Projects in India , 2014 .

[32]  Jochen Teizer,et al.  Construction resource efficiency improvement by Long Range Wide Area Network tracking and monitoring , 2020 .

[33]  Paul. Olomolaiye,et al.  An evaluation of the relationships between bricklayers' motivation and productivity , 1990 .

[34]  Jacob Cohen,et al.  A power primer. , 1992, Psychological bulletin.

[35]  Eddy M. Rojas,et al.  Estimating Labor Productivity Frontier: A Pilot Study , 2014 .

[36]  James L. Jenkins,et al.  Mechanical and general construction productivity results , 2004 .

[37]  D F Rogge,et al.  Foreman-Delay Surveys: Work Sampling and Output , 1982 .

[38]  Janaka Y. Ruwanpura,et al.  Predicting construction productivity using situation-based simulation models , 2006 .