Data management for animation of construction processes

Animation of construction processes is a useful tool to understand the complexity of civil engineering projects. The basic idea of existing four-dimensional (4D) animation approaches is to establish a link between a construction task and the component where the task is executed. Tasks are defined in scheduling tools; components are defined in CAD tools. The use of three-dimensional (3D) CAD tools for the specification of components in combination with a schedule results in a 4D CAD environment where time represents the fourth dimension. A lot of investigations have been conducted, and 4D CAD is used more and more in civil engineering projects. However, the approaches described in literature accept the existence of traditional scheduling and traditional 3D CAD. Tasks are stored in scheduling tools; and components are stored in CAD tools. This paper presents the use of an approach for animating construction processes that has been originally developed for scheduling. The data model of this approach is described, and consequences of using this approach in the field of animating construction processes are discussed and illustrated. The approach has been tested in practice; and examples from real projects are presented. These examples show the power of the approach presented: the data management allows an efficient and suitable use of animating different kinds of information. Different kinds of projects require an animation of different kinds of information, and this can be done without any additional effort. However, the approach does not result in different animations compared to existing tools; the novelty results from the possibility to animate different kinds of information.

[1]  Nashwan Dawood,et al.  Lean enterprise web-based information system for construction (LEWIS): a framework , 2002 .

[2]  Martin Fischer,et al.  Areas of Application for 3D and 4D Models on Construction Projects , 2008 .

[3]  Sheryl Staub-French,et al.  3D and 4D modeling for design and construction coordination: issues and lessons learned , 2007, J. Inf. Technol. Constr..

[4]  Rogier Jongeling,et al.  A method for planning of work-flow by combined use of location-based scheduling and 4D CAD , 2007 .

[5]  Wolfgang Huhnt Process Modelling in Civil Engineering , 2009 .

[6]  Kwok-wing Chau,et al.  Four-dimensional visualization of construction scheduling and site utilization , 2004 .

[7]  Sheryl Staub-French,et al.  Linear scheduling and 4D visualization , 2008 .

[8]  Wolfgang Huhnt,et al.  Can algorithms support the specification of construction schedules? , 2006, J. Inf. Technol. Constr..

[9]  Martin Fischer,et al.  Case Study of the Implementation of the Lean Project Delivery System (LPDS) Using Virtual Building Technologies on a Large Healthcare Project , 2005 .

[10]  Falko Kuester,et al.  The StarCAVE, a third-generation CAVE and virtual reality OptIPortal , 2009, Future Gener. Comput. Syst..

[11]  Chung-Wei Feng,et al.  Using the MD CAD model to develop the time–cost integrated schedule for construction projects , 2010 .

[12]  A. Jan Pahl,et al.  Mathematical Foundations of Computational Engineering: A Handbook , 2001 .

[13]  Arkady Retik,et al.  A library-based 4D visualisation of construction processes , 1997, Proceedings. 1997 IEEE Conference on Information Visualization (Cat. No.97TB100165).

[14]  Sheryl Staub-French,et al.  Visualizing high-rise building construction strategies using linear scheduling and 4D CAD , 2009 .