A semi-automated approach to generate 4D/5D BIM models for evaluating different offshore oil and gas platform decommissioning options

BackgroundOffshore oil and gas platforms generally have a lifetime of 30 to 40 years, and platform decommissioning is a major issue because many of the existing offshore oil and gas platforms are reaching the end of their service life. There are many possible options for decommissioning offshore oil and gas platforms, and each decommissioning option can be implemented using different methods and technologies. Therefore, it is necessary to have a clear understanding and in-depth evaluation of each decommissioning option before commencing platform decommissioning. 4D and 5D building information modeling (BIM) has been commonly used in the building industry to analyze constructability and to evaluate different construction or demolition plans. However, application of BIM in the oil and gas industry, especially for the platform decommissioning process, is still limited.MethodsThis paper suggests and demonstrates the application of 4D and 5D BIM technology to simulate various methodologies to realize various selected offshore platform decommissioning options, thereby visualizing and evaluating different options, considering both the time and resources required for decommissioning process. One hundred and seventy-seven offshore platform decommissioning options are summarized in this paper. A new approach to create multiple 4D/5D BIM models in a semi-automated manner for evaluating various scenario options of OOGP decommissioning was proposed to reduce the model creation time as current way of 4D/5D BIM model creation for each OOGP decommissioning option is time consuming.ResultsIn the proposed approach, an OOGP BIM model relationship database that contains possible 4D/5D BIM model relationships (i.e. schedules for different decommissioning methods) for different parts of an OOGP was generated. Different OOGP decommissioning options can be simulated and visualized with 4D/5D BIM models created by automatically matching schedules, resources, cost information and 3D BIM models. This paper also presents an illustrative example of the proposed approach, which simulates and evaluates two decommissioning options of a fixed jacket platform, namely Rig-to-Reef and Removal-to-Shore. As compared to the traditional approach of 4D/5D BIM model generation, the proposed semi-automated approach reduces the model generation time by 58.8% in the illustrative example.ConclusionsThe proposed approach of semi-automated 4D/5D BIM model creation can help understand the implication of different decommissioning options as well as applied methods, detecting potential lifting clashes, and reducing 4D/5D BIM model creation time, leading to better planning and execution for the decommissioning of offshore oil and gas platforms. In addition, with the proposed semi-automated approach, the 4D/5D BIM model can be generated in a more efficient manner.

[1]  Jian-Ping Zhang,et al.  Construction process simulation and safety analysis based on building information model and 4D technology , 2008 .

[2]  Zbigniew Kacprzyk,et al.  Building Information Modelling – 4D Modelling Technology on the Example of the Reconstruction Stairwell , 2014 .

[3]  Brock B Bernstein,et al.  Evaluating alternatives for decommissioning California's offshore oil and gas platforms , 2015, Integrated environmental assessment and management.

[4]  Jack Chin Pang Cheng,et al.  A financial decision making framework for construction projects based on 5D Building Information Modeling (BIM) , 2016 .

[5]  Banu Muthukumar,et al.  Appearance-based material classification after occlusion removal for operation-level construction progress monitoring , 2015 .

[6]  Sergio Scheer,et al.  On-Site BIM Model Use to Integrate 4D/5D Activities and Construction Works: A Case Study on a Brazilian Low Income Housing Enterprise , 2014 .

[7]  Lieyun Ding,et al.  Application of 4D visualization technology for safety management in metro construction , 2013 .

[8]  M. S. Liew,et al.  Decommissioning of offshore platform: A sustainable framework , 2012, 2012 IEEE Colloquium on Humanities, Science and Engineering (CHUSER).

[9]  David Mitchell 5D BIM: CREATING COST CERTAINTY AND BETTER BUILDINGS , 2012 .

[10]  Jack Chin Pang Cheng,et al.  Analytical review and evaluation of civil information modeling , 2016 .

[11]  Xin Liu,et al.  A BIM-based framework for lift planning in topsides disassembly of offshore oil and gas platforms , 2017 .

[12]  Mani Golparvar-Fard,et al.  Appearance-based material classification for monitoring of operation-level construction progress using 4D BIM and site photologs , 2015 .

[13]  Nashwan Dawood,et al.  Development of workspace conflict visualization system using 4D object of work schedule , 2014, Adv. Eng. Informatics.

[14]  Changmin Kim,et al.  Automated construction progress measurement using a 4D building information model and 3D data , 2013 .

[15]  Brock Bernstein,et al.  A multi‐attribute decision analysis for decommissioning offshore oil and gas platforms , 2015, Integrated environmental assessment and management.