Electric power system cost/loss optimization using Dynamic Thermal Rating and linear programming
暂无分享,去创建一个
Jana Heckenbergerova | Petr Musilek | Don Koval | Milad Khaki | P. Musílek | J. Heckenbergerova | MILAD KHAKI | D. Koval
[1] Jong-Bae Park,et al. A hybrid genetic algorithm/dynamic programming approach to optimal long-term generation expansion planning , 1998 .
[2] M.W. Davis,et al. A new thermal rating approach: The real time thermal rating system for strategic overhead conductor transmission lines -- Part I: General description and justification of the real time thermal rating system , 1977, IEEE Transactions on Power Apparatus and Systems.
[3] Daniel S. Kirschen,et al. What is spinning reserve , 2005 .
[4] L. C. Campbell. Electric Power Transmission System Engineering , 1989 .
[5] Friedrich Kiessling. Overhead Power Lines: Planning, Design, Construction , 2003 .
[6] S. M. Shahidehpour,et al. Heuristic multi-area unit commitment with economic dispatch , 1991 .
[7] L. Lai. Power system restructuring and deregulation : trading, perfomance and information technology , 2001 .
[8] Friedrich Kiessling,et al. Overhead Power Lines , 2003 .
[9] Vishnu Prasad,et al. Economic dispatch using particle swarm optimization: A review , 2009 .
[10] Turan Gönen,et al. Electric Power Transmission System Engineering: Analysis and Design , 1988 .
[11] F.D. Galiana,et al. Electrothermal coordination part I: theory and implementation schemes , 2005, IEEE Transactions on Power Systems.
[12] L. L. Garver,et al. Transmission Network Estimation Using Linear Programming , 1970 .
[13] David D. Parrish,et al. NORTH AMERICAN REGIONAL REANALYSIS , 2006 .
[14] Jong-Bae Park,et al. Generation expansion planning based on an advanced evolutionary programming , 1999 .
[15] Johan A. K. Suykens,et al. Electric Load Forecasting: Using Kernel-Based Modeling for Nonlinear System Identification , 2007 .
[16] Mohamed Mostafa Saied. Assessing the dynamic rating of overhead transmission lines , 2007 .
[17] H. Selanduray,et al. Power plant optimization in a regulated environment electricity supply industry: A least cost generation approach , 2008, 2008 IEEE 2nd International Power and Energy Conference.
[18] Young-Hyun Moon,et al. A new economic dispatch algorithm for thermal unit generation scheduling in power system , 2000, 2000 IEEE Power Engineering Society Winter Meeting. Conference Proceedings (Cat. No.00CH37077).
[19] Loi Lei Lai,et al. Power System Restructuring and Deregulation , 2001 .
[20] Yu Chze. Loh,et al. Business and financial reporting in the new economy. , 2002 .
[21] S. N. Singh,et al. Day-Ahead Self-Scheduling of Thermal Generator in Competitive Electricity Market Using Hybrid PSO , 2009, 2009 15th International Conference on Intelligent System Applications to Power Systems.
[22] David K. Smith. Network Flows: Theory, Algorithms, and Applications , 1994 .
[23] Ravindra K. Ahuja,et al. Network Flows , 2011 .
[24] Jana Heckenbergerova,et al. Identification of critical aging segments and hotspots of power transmission lines , 2010, 2010 9th International Conference on Environment and Electrical Engineering.
[25] S. M. Shahidehpour,et al. Effects of ramp-rate limits on unit commitment and economic dispatch , 1993 .
[26] B. De Moor,et al. Electric Load Forecasting , 2007, IEEE Control Systems.
[27] D. R. Swatek. An expected per-unit rating for overhead transmission lines , 2004 .
[28] O.A. Ciniglio,et al. Optimizing transmission path utilization in Idaho Power , 2004, IEEE Transactions on Power Delivery.
[29] Anjan K. Deb. Powerline Ampacity System: Theory, Modeling and Applications , 2000 .
[30] F.D. Galiana,et al. Electrothermal coordination part II: case studies , 2005, IEEE Transactions on Power Systems.
[31] R. Adapa,et al. Dynamic thermal ratings: monitors and calculation methods , 2005, 2005 IEEE Power Engineering Society Inaugural Conference and Exposition in Africa.