Contractor selection using the analytic network process

Contractor selection is one of the main activities of clients. Without a proper and accurate method for selecting the most appropriate contractor, the performance of the project will be affected. The multi‐criteria decision‐making (MCDM) is suggested to be a viable method for contractor selection. The analytic hierarchy process (AHP) has been used as a tool for MCDM. However, AHP can only be employed in hierarchical decision models. For complicated decision problems, the analytic network process (ANP) is highly recommended since ANP allows interdependent influences specified in the model. An example is demonstrated to illustrate how this method is conducted, including the formation of supermatrix and the limit matrix.

[1]  Gary David Holt Classifying construction contractors , 1997 .

[2]  Joseph Sarkis,et al.  Hub location at Digital Equipment Corporation: A comprehensive analysis of qualitative and quantitative factors , 2002, Eur. J. Oper. Res..

[3]  Gary David Holt,et al.  Lowest price or value? Investigation of UK construction clients' tender selection process , 2000 .

[4]  Thomas L. Saaty,et al.  Decision making with dependence and feedback : the analytic network process : the organization and prioritization of complexity , 1996 .

[5]  Heng Li,et al.  Analytic hierarchy process , 2001 .

[6]  Joseph Sarkis,et al.  Analyzing organizational project alternatives for agile manufacturing processes: An analytical network approach , 1999 .

[7]  Za Hatush Contractor selection using the multiattribute utility theory , 1996 .

[8]  Patrick S. W. Fong,et al.  Final contractor selection using the analytical hierarchy process , 2000 .

[9]  Gary David Holt,et al.  Evaluating prequalification criteria in contractor selection , 1994 .

[10]  Jeffrey S. Russell,et al.  Risk analysis approach to selection of contractor evaluation method , 1992 .

[11]  Gary David Holt,et al.  WHICH CONTRACTOR SELECTION METHODOLOGY , 1998 .

[12]  Joseph Sarkis,et al.  Strategic analysis of logistics and supply chain management systems using the analytical network process , 1998 .

[13]  Martin Skitmore,et al.  Criteria for contractor selection , 1997 .

[14]  Thomas L. Saaty,et al.  How to Make a Decision: The Analytic Hierarchy Process , 1990 .

[15]  Miroslaw J. Skibniewski,et al.  DECISION CRITERIA IN CONTRACTOR PREQUALIFICATION , 1988 .

[16]  Heng Li,et al.  Construction Partnering Process and Associated Critical Success Factors: Quantitative Investigation , 2002 .

[17]  Michael Riley,et al.  A multi‐criteria approach to contractor selection , 2002 .

[18]  Jeffrey S. Russell,et al.  Contractor prequalification data for construction owners , 1992 .

[19]  Gary David Holt,et al.  A review of contractor selection practice in the U.K. construction industry , 1995 .

[20]  Luis F. Alarcón,et al.  PERFORMANCE MODELING FOR CONTRACTOR SELECTION , 2002 .

[21]  Joeseph Sarkis,et al.  A methodological framework for evaluating environmentally conscious manufacturing programs , 1999 .

[22]  R Valentine EFFECTIVE CONTRACT ADMINISTRATION FOR ROAD, BRIDGE AND GENERAL CIVIL ENGINEERING WORKS , 1995 .

[23]  M. Bohanec,et al.  The Analytic Hierarchy Process , 2004 .

[24]  Thomas L. Saaty How to Make a Decision: The Analytic Hierarchy Process , 1994 .

[25]  N. M. Samelson,et al.  Owner's Guidelines for Selecting Safe Contractors , 1982 .