A cyclical search for the two machine flow shop and open shop to minimise finishing time
暂无分享,去创建一个
[1] Michael Pinedo,et al. Stochastic Shop Scheduling: A Survey , 1982 .
[2] S. M. Johnson,et al. Optimal two- and three-stage production schedules with setup times included , 1954 .
[3] Kevin Mahon,et al. Deterministic and Stochastic Scheduling , 1983 .
[4] D. de Werra,et al. Graph-theoretical models for preemptive scheduling , 1989 .
[5] Chung-Yee Lee,et al. Three is easy, two is hard: open shop sum-batch scheduling problem refined , 2006, Oper. Res. Lett..
[6] Teofilo F. Gonzalez,et al. Open Shop Scheduling to Minimize Finish Time , 1976, JACM.