Quality conrol of body-bogie assembling of motor train set
暂无分享,去创建一个
The bogies are key components forhigh-speed ( ≥ 200km/h) motor train set to run safelyand smoothly. The quality control of body-bogie assembling for CRH2A EMU was investigated, and the specifalmeasures were given.