Commissioning results from the Large Binocular Telescope
暂无分享,去创建一个
John M. Hill | Andrew Rakich | David Thompson | Douglas L. Miller | Richard F. Green | Joar G. Brynnel | Norman J. Cushing | Doug L. Miller | R. Green | D. Thompson | J. Brynnel | A. Rakich | J. Hill | N. Cushing
[1] Tom Herbst,et al. An Infrared Test Camera for LBT adaptive optics commissioning , 2008, Astronomical Telescopes + Instrumentation.
[2] W. Seifert,et al. LUCIFER1 commissioning at the LBT , 2010, Astronomical Telescopes + Instrumentation.
[3] J. M. Hill,et al. The Large Binocular Telescope , 2008, Astronomical Telescopes + Instrumentation.
[4] S. Rabien,et al. ARGOS: the laser guide star system for the LBT , 2010, Astronomical Telescopes + Instrumentation.
[5] John M. Hill,et al. Mixing completion, commissioning, and operations at the LBT , 2010, Astronomical Telescopes + Instrumentation.
[6] Armando Riccardi,et al. First light AO (FLAO) system for LBT: final integration, acceptance test in Europe, and preliminary on-sky commissioning results , 2010, Astronomical Telescopes + Instrumentation.
[7] A. Rakich. Alignment of LBT optics using a laser tracker , 2010, Astronomical Telescopes + Instrumentation.
[8] Andrew Rakich,et al. Use of field aberrations in the alignment of the Large Binocular Telescope optics , 2008, Astronomical Telescopes + Instrumentation.
[9] John M. Hill,et al. Mixing completion, commissioning, and operations at the LBT , 2010, Other Conferences.
[10] T. J. McMahon,et al. OVMS: the optical path difference and vibration monitoring system for the LBT and its interferometers , 2010, Astronomical Telescopes + Instrumentation.
[11] John M. Hill,et al. Performance and results from the commissioning of the first acquisition, guiding, and wavefront sensing units for the Large Binocular Telescope , 2010, Astronomical Telescopes + Instrumentation.
[12] R. Mark Wagner,et al. An overview of instrumentation for the Large Binocular Telescope , 2003, SPIE Astronomical Telescopes + Instrumentation.