Activity vulnerability index for delay risk forecasting
暂无分享,去创建一个
[1] Aminah Robinson Fayek,et al. Automated Corrective Action Selection Assistant , 1994 .
[2] Lefteri H. Tsoukalas,et al. Fuzzy and neural approaches in engineering , 1997 .
[3] S.-J. Guo. COMPUTER-AIDED PROJECT DURATION FORECASTING SUBJECTED TO THE IMPACT OF RAIN , 2000 .
[4] Hira N. Ahuja,et al. Simulation Model to Forecast Project Completion Time , 1985 .
[5] Donn E. Hancher,et al. Estimating Precipitation Impacts for Scheduling , 1989 .
[6] Sadi Assaf,et al. Causes of Delay in Large Building Construction Projects , 1995 .
[7] Lotfi A. Zadeh,et al. Fuzzy Sets , 1996, Inf. Control..
[8] D. Dubois,et al. Fundamentals of fuzzy sets , 2000 .
[9] John R. Baldwin,et al. Causes of Delay in the Construction Industry , 1971 .
[10] Achintya Haldar,et al. Project Scheduling Using Fuzzy Set Concepts , 1984 .
[11] Ronald McCaffer,et al. FACTORS OF NON-EXCUSABLE DELAYS THAT INFLUENCE CONTRACTORS' PERFORMANCE , 1998 .
[12] James T. P. Yao. Damage Assessment of Existing Structures , 1980 .
[13] Daniel W. Halpin,et al. Predictive Tool for Estimating Accident Risk , 2003 .
[14] Fran Ackermann,et al. Production , Manufacturing and Logistics Structuring a delay and disruption claim : An application of cause-mapping and system dynamics , 2003 .
[15] Robert I. Carr,et al. Resource Strategies for Dynamic Project Management , 1991 .
[16] Osama Moselhi,et al. Project-network analysis using fuzzy sets theory , 1996 .
[17] Fran Ackermann,et al. The role of feedback dynamics in disruption and delay on the nature of disruption and delay (D&D) in major projects , 2000, J. Oper. Res. Soc..
[18] Michael T. Callahan,et al. Construction Delay Claims , 1992 .
[19] Simaan M. AbouRizk,et al. Simplified CPM/PERT Simulation Model , 2000 .
[20] Aminah Robinson Fayek,et al. Fuzzy Logic Approach for Activity Delay Analysis and Schedule Updating , 2005 .
[21] Terry Williams. Criticality in Stochastic Networks , 1992 .
[22] Ali Touran,et al. Monte Carlo Technique with Correlated Random Variables , 1992 .
[23] Achintya Haldar,et al. Decisions in Construction Operations , 1985 .
[24] Khaled A El-Rayes,et al. Estimating weather impact on the duration of construction activities , 1997 .