Activity vulnerability index for delay risk forecasting

The vulnerability of construction activities to delay factors controls the magnitude of the delay impact. Vulnerability characteristics of construction activities result in different patterns of duration variation. To identify the relationship between the delay factors and an activity's vulnerability, an activity vulnerability index was developed based on the subjective knowledge of experienced experts in construction operations. Incorporating the fuzzy set theory, the index provides not only information about the quantified vulnerability characteristics of an activity but also a reference for an activity criticality assessment. This study intends to suggest a framework for delay risk assessment and forecasting.Key words: construction delay, vulnerability index, fuzzy set theory.

[1]  Aminah Robinson Fayek,et al.  Automated Corrective Action Selection Assistant , 1994 .

[2]  Lefteri H. Tsoukalas,et al.  Fuzzy and neural approaches in engineering , 1997 .

[3]  S.-J. Guo COMPUTER-AIDED PROJECT DURATION FORECASTING SUBJECTED TO THE IMPACT OF RAIN , 2000 .

[4]  Hira N. Ahuja,et al.  Simulation Model to Forecast Project Completion Time , 1985 .

[5]  Donn E. Hancher,et al.  Estimating Precipitation Impacts for Scheduling , 1989 .

[6]  Sadi Assaf,et al.  Causes of Delay in Large Building Construction Projects , 1995 .

[7]  Lotfi A. Zadeh,et al.  Fuzzy Sets , 1996, Inf. Control..

[8]  D. Dubois,et al.  Fundamentals of fuzzy sets , 2000 .

[9]  John R. Baldwin,et al.  Causes of Delay in the Construction Industry , 1971 .

[10]  Achintya Haldar,et al.  Project Scheduling Using Fuzzy Set Concepts , 1984 .

[11]  Ronald McCaffer,et al.  FACTORS OF NON-EXCUSABLE DELAYS THAT INFLUENCE CONTRACTORS' PERFORMANCE , 1998 .

[12]  James T. P. Yao Damage Assessment of Existing Structures , 1980 .

[13]  Daniel W. Halpin,et al.  Predictive Tool for Estimating Accident Risk , 2003 .

[14]  Fran Ackermann,et al.  Production , Manufacturing and Logistics Structuring a delay and disruption claim : An application of cause-mapping and system dynamics , 2003 .

[15]  Robert I. Carr,et al.  Resource Strategies for Dynamic Project Management , 1991 .

[16]  Osama Moselhi,et al.  Project-network analysis using fuzzy sets theory , 1996 .

[17]  Fran Ackermann,et al.  The role of feedback dynamics in disruption and delay on the nature of disruption and delay (D&D) in major projects , 2000, J. Oper. Res. Soc..

[18]  Michael T. Callahan,et al.  Construction Delay Claims , 1992 .

[19]  Simaan M. AbouRizk,et al.  Simplified CPM/PERT Simulation Model , 2000 .

[20]  Aminah Robinson Fayek,et al.  Fuzzy Logic Approach for Activity Delay Analysis and Schedule Updating , 2005 .

[21]  Terry Williams Criticality in Stochastic Networks , 1992 .

[22]  Ali Touran,et al.  Monte Carlo Technique with Correlated Random Variables , 1992 .

[23]  Achintya Haldar,et al.  Decisions in Construction Operations , 1985 .

[24]  Khaled A El-Rayes,et al.  Estimating weather impact on the duration of construction activities , 1997 .