Enabling rollback support in IT change management systems

The current research on IT change management has been exploring several aspects of this new discipline, but it usually assumes that changes expressed in requests for change (RFC) documents will be successfully executed over the managed IT infrastructure. This assumption, however, is not realistic in actual IT systems because failures during the execution of changes do happen and cannot be ignored. In order to address this issue, we propose a solution where tightly-related change activities are grouped together forming atomic groups of activities. These groups are atomic in the sense that if one activity fails, all other already executed activities of the same group must rollback to move the system backwards to the previous state. The automation of change rollback is especially convenient because it relieves the IT human operator of manually undoing the activities of a change group that has failed. To prove concept and technical feasibility, we have materialized our solution in a prototype system that, using elements of the business process execution language (BPEL), is able to control how atomic groups of activities must be handled in IT change management systems.

[1]  Akhil Sahai,et al.  FEEDBACKFLOW-An Adaptive Workflow Generator for Systems Management , 2005, Second International Conference on Autonomic Computing (ICAC'05).

[2]  Rob Enns,et al.  NETCONF Configuration Protocol , 2006, RFC.

[3]  George Candea,et al.  Recovery-oriented computing: building multitier dependability , 2004, Computer.

[4]  D. Trastour,et al.  IT service management driven by business objectives An application to incident management , 2006, 2006 IEEE/IFIP Network Operations and Management Symposium NOMS 2006.

[5]  Kun-Lung Wu,et al.  The CHAMPS system: change management with planning and scheduling , 2004, 2004 IEEE/IFIP Network Operations and Management Symposium (IEEE Cat. No.04CH37507).

[6]  Francisco Curbera,et al.  Web Services Business Process Execution Language Version 2.0 , 2007 .

[7]  Lisandro Zambenedetti Granville,et al.  A Protocol for Atomic Deployment of Management Policies in QoS-Enabled Networks , 2006, IPOM.

[8]  Claudio Bartolini,et al.  A decision support tool to optimize scheduling of IT changes , 2007, 2007 10th IFIP/IEEE International Symposium on Integrated Network Management.