Stochastic single machine scheduling with an exponentially distributed due date
暂无分享,去创建一个
[1] Gur Mosheiov,et al. Single Machine Scheduling Problems with General Breakdowns, Earliness and Tardiness Costs , 1997, Oper. Res..
[2] Suresh P. Sethi,et al. Earliness-Tardiness Scheduling Problems, II: Deviation of Completion Times About a Restrictive Common Due Date , 1991, Oper. Res..
[3] J. B. G. Frenk,et al. A General Framework for Stochastic One-machine Scheduling Problems with Zero Release Times and No Partial Ordering , 1991, Probability in the Engineering and Informational Sciences.
[4] Michael Pinedo,et al. Stochastic Scheduling with Release Dates and Due Dates , 1983, Oper. Res..
[5] Michael Pinedo,et al. A Note on Stochastic Scheduling on a Single Machine Subject to Breakdown and Repair , 1988, Probability in the Engineering and Informational Sciences.
[6] J. A. Hoogeveen,et al. Scheduling around a small common due date , 1991 .
[7] Gary D. Scudder,et al. Sequencing with Earliness and Tardiness Penalties: A Review , 1990, Oper. Res..
[8] A.H.G. Rinnooy Kan,et al. Single‐machine scheduling subject to stochastic breakdowns , 1990 .
[9] Frank G. Forst. Stochastic Sequencing on One Machine with Earliness and Tardiness Penalties , 1993 .
[10] Marc E. Posner,et al. Earliness-Tardiness Scheduling Problems, I: Weighted Deviation of Completion Times About a Common Due Date , 1991, Oper. Res..
[11] M. Raghavachari,et al. Stochastic Single Machine Scheduling with Quadratic Early-Tardy Penalties , 1993, Oper. Res..
[12] Xiaoqiang Cai,et al. Stochastic Scheduling on Parallel Machines Subject to Random Breakdowns to Minimize Expected Costs for Earliness and Tardy Jobs , 1999 .