Probabilistic Production Costing With Dependent Generating Sources

Dependent generators are power sources whose output depends on natural factors which are statistically interdependent with the load, such as wind turbines and solar photovoltaic cells. Because of these statistical interactions, usual methods of probabilistic production costing cannot be used. This paper presents a new method for production costing which treats power sources with statistically correlated outputs. The method uses the Gram-Charlier series and a modification of the cumulants summation formula which accounts for statistical correlation. The paper also discusses additional applications of this method and some computational results.

[1]  Michael C. Caramanis,et al.  The Introduction of Non-Dispatchable Technologies as Decision Variables in Long-Term Generation Expansion Models , 1982, IEEE Power Engineering Review.

[2]  J. Bloom Long-Range Generation Planning Using Decomposition and Probabilistic Simulation , 1982, IEEE Transactions on Power Apparatus and Systems.

[3]  C. Necsulescu,et al.  Reliability of Interconnected Power Systems With Correlated Demands , 1982, IEEE Transactions on Power Apparatus and Systems.

[4]  Michael Caramanisember,et al.  Analysis of Non-Dispatchable Options in the Generation Expansion Plan , 1983, IEEE Transactions on Power Apparatus and Systems.

[5]  R. B. Misra,et al.  Expected Energy Production Cost of Two Interconnected Systems with Correlated Demands , 1983, IEEE Transactions on Power Apparatus and Systems.

[6]  J. Stremel,et al.  Production Costing Using the Cumulant Method of Representing the Equivalent Load Curve , 1980, IEEE Transactions on Power Apparatus and Systems.

[7]  N.S. Rau,et al.  Expected Energy Production Costs by the Method of Moments , 1980, IEEE Transactions on Power Apparatus and Systems.

[8]  Peter W. Sauer,et al.  A Convenient Multivariate Gram-Charlier Type A Series , 1979, IEEE Trans. Commun..

[9]  N. Rau,et al.  A Method to Evaluate Economic Benefits in Interconnected Systems , 1983, IEEE Transactions on Power Apparatus and Systems.

[10]  L. R. Noyes Two-Area Probabilistic Production Costing by the Method of Bi-variant Cumulants , 1983, IEEE Power Engineering Review.

[11]  Jeremy Bloom,et al.  Long Range Generation Planning With Limited Energy and Storage Plants Part I: Production Costing , 1983, IEEE Transactions on Power Apparatus and Systems.