Use of an Analytic Network Process and Monte Carlo Analysis in New Product Formula Selection Decisions

One crucial matter in routine life is decision-making. Although decision-making in everyday life appears to be easily dealt with by one-on-one comparisons, the same is not true with decision-making in business. In business management decisions, problems are more complicated than those in individual life because most business situations fall into the category of multi-criteria decision-making (MCDM) problems. Therefore, appropriate multi-criteria decision methods should be carefully selected to solve these problems. This study uses the analytic network process (ANP), one of the widely available multi-criteria decision methods. However, this popular method generally ignores the uncertainty inherent in the input data. Therefore, this paper proposes an improved process that considers uncertainty by using Monte Carlo analysis with input values then applied to the ANP procedures. This proposed method is implemented by a real business that produces roof tiles; the primary goal of the study is to select among newly developed roof formulas by considering the uncertainty and interrelation among decision criteria and elements as well as alternatives. The outcomes of study accurately rank the new product formulas. Furthermore, the results of improved method differ the rankings produced by the original ANP. The observed dissimilarities mainly result from uncertainty consideration discussed in this study.

[1]  Mustafa Yurdakul,et al.  Measuring long-term performance of a manufacturing firm using the Analytic Network Process (ANP) approach , 2003 .

[2]  József Vörös,et al.  The dynamics of price, quality and productivity improvement decisions , 2006, Eur. J. Oper. Res..

[3]  Rayna Georgieva,et al.  Adaptive Monte Carlo Approach for Sensitivity Analysis , 2010 .

[4]  Ashraf Labib,et al.  Performance evaluation of reconfigurable manufacturing systems via holonic architecture and the analytic network process , 2011 .

[5]  Y. J. Lin,et al.  Supplier selection using analytic network process and data envelopment analysis , 2012 .

[6]  S. H. Zanakis,et al.  A Monte Carlo investigation of incomplete pairwise comparison matrices in AHP , 1997 .

[7]  Thomas L. Saaty,et al.  The Analytic Network Process: Decision Making With Dependence and Feedback , 2001 .

[8]  Jui-Sheng Chou,et al.  Cost simulation in an item-based project involving construction engineering and management , 2011 .

[9]  Kw Chau The validity of the triangular distribution assumption in Monte Carlo simulation of construction costs: empirical evidence from Hong Kong , 1995 .

[10]  Ratapol Wudhikarn Improving overall equipment cost loss adding cost of quality , 2012 .

[11]  S. Pettigrew,et al.  Product involvement and the evaluation of wine quality , 2006 .

[12]  Kwang-Jae Kim,et al.  Determination of an Optimal Set of Design Requirements Using House of Quality , 1998 .

[13]  Edmundas Kazimieras Zavadskas,et al.  A new hybrid model for evaluating the working strategies: case study of construction company , 2012 .

[14]  E. Rosenbloom A probabilistic interpretation of the final rankings in AHP , 1997 .

[15]  Alan Brennan,et al.  Simulation sample sizes for Monte Carlo partial EVPI calculations. , 2010, Journal of health economics.

[16]  P. G. Ramanujam,et al.  Service Quality in Health Care Organisations , 2011 .

[17]  Zongzhi Li,et al.  Highway Project Level Life-Cycle Benefit/Cost Analysis under Certainty, Risk, and Uncertainty: Methodology with Case Study , 2009 .

[18]  Amrik S. Sohal,et al.  Longitudinal analysis of quality management practices in Australian organizations , 1999 .

[19]  Mónica García-Melón,et al.  Setting competitiveness indicators using BSC and ANP , 2012 .

[20]  David Vose,et al.  Quantitative Risk Analysis: A Guide to Monte Carlo Simulation Modelling , 1996 .

[21]  Shinhong Kim,et al.  An integrated approach for interdependent information system project selection , 2001 .

[22]  Nannan Wang,et al.  Multi-criteria decision-making model for whole life costing design , 2011 .

[23]  J. J. Cronin,et al.  Some New Thoughts on Conceptualizing Perceived Service Quality: A Hierarchical Approach , 2001 .

[24]  Janko Straßburg,et al.  Monte Carlo scalable algorithms for Computational Finance , 2011, ICCS.

[25]  Alan S. Dunk,et al.  Product quality, environmental accounting and quality performance , 2002 .

[26]  Edmundas Kazimieras Zavadskas,et al.  Risk evaluation of tunneling projects , 2012 .

[27]  Madjid Tavana,et al.  A novel hybrid social media platform selection model using fuzzy ANP and COPRAS-G , 2013, Expert Syst. Appl..

[28]  Tsuen-Ho Hsu,et al.  Application of Monte Carlo AHP in ranking dental quality attributes , 2009, Expert Syst. Appl..

[29]  Jih-Jeng Huang,et al.  A Constrained Fuzzy Arithmetic Method for the Fuzzy Analytic Network Process , 2007, Fourth International Conference on Fuzzy Systems and Knowledge Discovery (FSKD 2007).

[30]  T. Saaty Decision making — the Analytic Hierarchy and Network Processes (AHP/ANP) , 2004 .

[31]  Shirley J. Daniel,et al.  Quality Consciousness in Japanese and U.S. electronics manufacturers: an examination of the impact of quality strategy and management control systems on perceptions of the importance of quality to expected management rewards , 1995 .

[32]  H. Yamashina,et al.  Manufacturing cost deployment , 2002 .

[33]  Richard Y. K. Fung,et al.  A new approach to quality function deployment planning with financial consideration , 2002, Comput. Oper. Res..

[34]  Eng Ung Choo,et al.  Magnitude adjustment for AHP benefit/cost ratios , 2001, Eur. J. Oper. Res..

[35]  K. B. Hendricks,et al.  Does Implementing an Effective TQM Program Actually Improve Operating Performance? Empirical Evidence from Firms That Have Won Quality Awards , 1997 .

[36]  Z. Ayağ,et al.  An analytic network process-based approach to concept evaluation in a new product development environment , 2007 .

[37]  Wann-Ming Wey A Multiobjective Optimization Model for Urban Renewal Projects Selection with Uncertainty Considerations , 2008, 2008 Fourth International Conference on Natural Computation.

[38]  Tarek Zayed,et al.  Contractor Selection Model for Highway Projects Using Integrated Simulation and Analytic Network Process , 2013 .

[39]  Robert C. Creese,et al.  Estimating and Costing for the Metal Manufacturing Industries , 1992 .

[40]  Thomas L. Saaty,et al.  Theory and Applications of the Analytic Network Process: Decision Making With Benefits, Opportunities, Costs, and Risks , 2005 .

[41]  Eugen Holzknecht Shot blasting goes high tech , 2005 .

[42]  Gülçin Büyüközkan,et al.  A fuzzy optimization model for QFD planning process using analytic network approach , 2006, Eur. J. Oper. Res..

[43]  Ahad Zare Ravasan,et al.  Developing a practical framework for assessing ERP post-implementation success using fuzzy analytic network process , 2013 .