Construction Factors and Monitoring Methods Relating to the Performance of Ventura Breakwater Core Loc Repair
暂无分享,去创建一个
In 1999 the Los Angeles District of the U.S. Army Corps of Engineers (USACE) repaired the north Ventura breakwater head. The head was rebuilt using 2-ton underlayer stone armored with 20-ton Core Loc units. This paper reviews basic design requirements and construction elements employed to achieve the repair. Available post construction monitoring techniques are discussed.