EOL strategy planning for components of returned products
暂无分享,去创建一个
Soh-Khim Ong | S. S. Yang | A. Y. C. Nee | A. Nee | S. Ong
[1] Atsuo Murata,et al. Development of an AHP–CBR evaluation system for remanufacturing: end-of-life selection strategy , 2011 .
[2] Sami Kara,et al. Toward integrated product and process life cycle planning—An environmental perspective , 2012 .
[3] Peter Schuur,et al. On a medium term product recovery and disposal strategy for durable assembly products , 1998 .
[4] Shahin Rahimifard,et al. A decision-making model for waste management in the footwear industry , 2007 .
[5] Hua Zhang,et al. A decision-making approach for end-of-life strategies selection of used parts , 2016 .
[6] Steven J. Skerlos,et al. Economic and Environmental Assessment of Automotive Remanufacturing: Alternator Case Study , 2008 .
[7] G. Keoleian,et al. The Value of Remanufactured Engines: Life‐Cycle Environmental and Economic Perspectives , 2004 .
[8] Dimitris Kiritsis,et al. Multiple criteria decision aid for selecting the best product end of life scenario , 2003, Int. J. Comput. Integr. Manuf..
[9] Michael R. Johnson. Evaluating remanufacturing and demanufacturing for extended producer responsibility and sustainable product management. , 2002 .
[10] S. G. Lee,et al. A Multi-Objective Methodology for Evaluating Product End-of-Life Options and Disassembly , 2001 .
[11] Hilmi Yüksel. Design of automobile engines for remanufacture with quality function deployment , 2010 .
[12] B. González,et al. A bill of materials-based approach for end-of-life decision making in design for the environment , 2005 .
[13] Nam Wook Cho,et al. A hierarchical end-of-life decision model for determining the economic levels of remanufacturing and disassembly under environmental regulations , 2010 .
[14] Aiman Ziout,et al. A holistic approach for decision on selection of end-of-life products recovery options , 2014 .
[15] Andrew King,et al. Using The Delphi Technique To Establish A Robust Research Agenda For Remanufacturing , 2007 .
[16] Yanbin Du,et al. An integrated method for evaluating the remanufacturability of used machine tool , 2012 .
[17] Surendra M. Gupta,et al. Disassembly sequencing using genetic algorithm , 2006 .
[18] Luk N. Van Wassenhove,et al. So What If Remanufacturing Cannibalizes My New Product Sales? , 2010 .
[19] Christopher J. Koroneos,et al. A methodological framework for end-of-life management of electronic products , 2009 .
[20] Winifred Ijomah,et al. Addressing decision making for remanufacturing operations and design-for-remanufacture , 2009 .
[21] Joseph W.K. Chan,et al. Product end-of-life options selection: grey relational analysis approach , 2008 .
[22] Dimitris Kiritsis,et al. A multi-objective evolutionary algorithm for EOL product recovery optimization: turbocharger case study , 2007 .
[23] Matthias Finkbeiner,et al. Life cycle approach to sustainability assessment: a case study of remanufactured alternators , 2012 .
[24] Paul A. Goodall,et al. A review of the state of the art in tools and techniques used to evaluate remanufacturing feasibility , 2014 .
[25] Jinxiang Dong,et al. A hierarchical approach to disassembly sequence planning for mechanical product , 2006 .
[26] Mark Ferguson,et al. The Value of Quality Grading in Remanufacturing , 2009 .
[27] Jun Ni,et al. Optimal control of reassembly with variable quality returns in a product remanufacturing system , 2011 .
[28] Ratna Babu Chinnam,et al. Aftermarket remanufacturing strategic planning decision-making framework: theory & practice , 2010 .
[29] Jong-Oh Park,et al. Optimal Disassembly Sequence Using Genetic Algorithms Considering Economic and Environmental Aspects , 2001 .