Pavement rehabilitation scheduling and toll pricing under different regulatory regimes

This paper addresses the highway pavement rehabilitation scheduling and toll pricing issues over a planning horizon. In the highway system concerned, two types of agents are considered, namely highway operator and road users. Two models, which account for different highway regulatory regimes (i.e. public and private), are proposed. In the public regulatory model, the government aims to maximize total discounted social welfare of the transportation system over the planning horizon by determining the optimal pavement rehabilitation schedule and toll level. In the private regulatory regime, a profit-driven private operator seeks to optimize the pavement rehabilitation schedule and toll level to maximize its own discounted net profit over the planning horizon. The proposed models treat the interactions between the highway operator and the road users in the system as a bi-level hierarchical problem in which the upper level is a multi-period pavement rehabilitation scheduling and toll pricing problem, while the lower level is a multi-period route choice equilibrium problem. A heuristic solution algorithm that combines a greedy approach and a sensitivity analysis based approach is developed to solve the proposed bi-level multi-period optimization models. An illustrative example is used to show the applications of the proposed models. The findings show that the highway regulatory regime, pavement deterioration parameter and the roughness-induced vehicle operating cost can significantly affect the pavement rehabilitation schedules and the toll level as well as the performance of transportation system in terms of total life-cycle travel demand, net profit and social welfare.

[1]  Seiichi Kagaya,et al.  Development of Life-Cycle Cost Evaluation Model for Pavements Considering Drivers' Route Choices , 2006 .

[2]  Joseph L. Schofer,et al.  Trend curve optimal control model for highway pavement maintenance: Case study and evaluation , 1994 .

[3]  Moshe Ben-Akiva,et al.  Optimal Inspection And Repair Policies For Transportation Facilities , 1994 .

[4]  Tamás Szántai,et al.  Optimization techniques for planning highway pavement improvements , 1995, Ann. Oper. Res..

[5]  W D Paterson,et al.  Quantifying the effectiveness of pavement maintenance and rehabilitation , 1990 .

[6]  Terry L. Friesz,et al.  Sensitivity Analysis for Equilibrium Network Flow , 1988, Transp. Sci..

[7]  Pablo Luis Durango-Cohen,et al.  A time series analysis framework for transportation infrastructure management , 2007 .

[8]  T. Friesz,et al.  A model of optimal transport maintenance with demand responsiveness , 1979 .

[9]  S. Travis Waller,et al.  The price of uncertainty in pavement infrastructure management planning: An integer programming approach , 2011 .

[10]  Geir Dahl,et al.  Methods based on discrete optimization for finding road network rehabilitation strategies , 2008, Comput. Oper. Res..

[11]  André de Palma,et al.  Maintenance, Service Quality and Congestion Pricing with Competing Roads , 2007 .

[12]  Pablo Luis Durango-Cohen,et al.  Estimation of infrastructure performance models using state-space specifications of time series models , 2007 .

[13]  Yosef Sheffi,et al.  Urban Transportation Networks: Equilibrium Analysis With Mathematical Programming Methods , 1985 .

[14]  S. Chandra Effect of Road Roughness on Capacity of Two-Lane Roads , 2004 .

[15]  Kurt Van Dender,et al.  Prices, capacities and service quality in a congestible Bertrand duopoly , 2005 .

[16]  Yafeng Yin,et al.  Estimating investment requirement for maintaining and improving highway systems , 2008 .

[17]  Samer Madanat,et al.  A steady-state solution for the optimal pavement resurfacing problem , 2002 .

[18]  Y. Ouyang,et al.  Optimal scheduling of rehabilitation activities for multiple pavement facilities: exact and approximate solutions , 2004 .

[19]  Shing Chung Josh Wong,et al.  Modeling Park-and-Ride Services in a Multimodal Transport Network with Elastic Demand , 2007 .

[20]  Shing Chung Josh Wong,et al.  The Optimal Transit Fare Structure under Different Market Regimes with Uncertainty in the Network , 2009 .

[21]  Yanfeng Ouyang,et al.  Joint Optimization of Pavement Maintenance and Resurfacing Planning , 2012 .

[22]  Yaser E. Hawas,et al.  DEVELOPMENT AND CALIBRATION OF ROUTE CHOICE UTILITY MODELS: FACTORIAL EXPERIMENTAL DESIGN APPROACH , 2004 .

[23]  Yanfeng Ouyang,et al.  An analytical solution for the finite-horizon pavement resurfacing planning problem , 2006 .

[24]  Hai Yang,et al.  HIGHWAY PRICING AND CAPACITY CHOICE IN A ROAD NETWORK UNDER A BUILD-OPERATE-TRANSFER SCHEME , 2000 .

[25]  William H. K. Lam,et al.  Modeling intermodal equilibrium for bimodal transportation system design problems in a linear monocentric city , 2012 .

[26]  Chih-Peng Chu,et al.  Road Pricing models with maintenance cost , 2004 .

[27]  W. Y. Szeto,et al.  Time-dependent transport network improvement and tolling strategies , 2008 .

[28]  Michael J Markow,et al.  OPTIMAL REHABILITATION FREQUENCIES FOR HIGHWAY PAVEMENTS , 1985 .

[29]  Anming Zhang,et al.  Impact of Regulation on Transport Infrastructure Capacity and Service Quality , 2012 .

[30]  Samer Madanat,et al.  A bottom-up solution for the multi-facility optimal pavement resurfacing problem , 2011 .

[31]  Ivan Damnjanovic,et al.  Design and Management Strategies for Mixed Public Private Transportation Networks: A Meta‐Heuristic Approach , 2009, Comput. Aided Civ. Infrastructure Eng..

[32]  Moshe E. Ben-Akiva,et al.  Optimal Inspection and Repair Policies for Infrastructure Facilities , 1994, Transp. Sci..

[33]  W. Y. Szeto,et al.  Time-dependent transport network design under cost-recovery , 2009 .