"Don't Lean Too Far - Distinguishing Between the Lean and Agile Manufacturing Paradigms"

The paper shows how the lean and agile paradigms may be selected according to marketplace requirements. These are distinctly different, since in the first case the market winner is cost, whereas in the second case the market winner is availability. Agile supply chains are required to be market sensitive and hence nimble. This means that the definition of waste is different from that appropriate to lean supply. The proper location of decoupling points for material flow and information flow enable a hybrid supply chain to be engineered. This encourages lean (efficient) supply upstream and agile (effective) supply downstream, thus bringing together the best of both paradigms. The paper concludes by proposing a cyclic migratory model which describes the PC supply chain attributes during its evolution from traditional to its present customised ‘leagile’ operation.

[1]  Herbert J. Grünwald,et al.  Many steps towards zero inventory , 1992 .

[2]  S. Hoekstra,et al.  Integral Logistic Structures: Developing Customer-Oriented Goods Flow , 1992 .

[3]  D. Towill,et al.  Information enrichment: designing the supply chain for competitive advantage , 1997 .

[4]  Robert Hiebeler,et al.  Best Practices: Building Your Business with Customer-Focused Solutions , 1998 .

[5]  D. Towill,et al.  Engineering the leagile supply chain , 2000 .

[6]  John L. Burbidge,et al.  Production flow analysis , 1963 .

[7]  Terry Hill,et al.  Manufacturing Strategy: Text and Cases , 1993 .

[8]  Toshihiro Murakoshi,et al.  Customer-driven manufacturing in Japan , 1994 .

[9]  Remko I. van Hoek,et al.  RECONFIGURING THE SUPPLY CHAIN TO IMPLEMENT POSTPONED MANUFACTURING , 1998 .

[10]  T. Davis Effective supply chain management , 2020, Strategic Direction.

[11]  Danny Berry,et al.  Leagility: Integrating the lean and agile manufacturing paradigms in the total supply chain , 1999 .

[12]  K. Beal,et al.  Integrated material logistics and continuous flow manufacturing , 1988 .

[13]  A. John Pendlebury,et al.  Business Process Reengineering: Breakpoint Strategies for Market Dominance , 1993 .

[14]  D. Towill,et al.  Engineering supply chains to match customer requirements , 2000 .

[15]  Denis Royston Towill,et al.  The seamless supply chain - the predator's strategic advantage , 1997 .

[16]  Mohamed Mohamed Naim,et al.  Business process re-engineering an electronic products supply chain , 1995 .

[17]  M. Fisher What is the Right Supply Chain for Your Product , 1997 .

[18]  D. Towill Time compression and supply chain management ‐ a guided tour , 1996 .

[19]  Taiichi Ohno,et al.  Toyota Production System : Beyond Large-Scale Production , 1988 .

[20]  M. Christopher Logistics & Supply Chain Management , 1998 .