Multilayer optimization and scheduling using model predictive control: application to reentrant semiconductor manufacturing lines

Abstract A two-layer production control method applied to discrete event reentrant semiconductor manufacturing lines is investigated. A modified l 1 -norm predictive controller/optimizer is proposed as a coordinator in the highest layer and a distributed control policy is used as a follow-up controller in the lowest layer. The use of a model predictive control (MPC) formulation allows the scheduling algorithm to simultaneously solve the production optimization and in-process inventory control problems at each sampling time. As an optimizer, the scheduler maximizes production rate and, as a controller, it addresses variability. Using this control-oriented framework, an optimal trade-off between production rate and cycle time is obtained. An l 1 -norm cost function allows the implementation of the optimization layer as a mixed integer linear program (MILP) which is solved at each time shift. The approach is applied to a one-product six-step, five-machine reentrant discrete event semiconductor manufacturing line whose specifications were provided by Intel Corporation.

[1]  A. Sharifnia Stability and performance of distributed production control methods based on continuous-flow models , 1994 .

[2]  Stanley B. Gershwin,et al.  Hierarchical flow control: a framework for scheduling and planning discrete events in manufacturing systems , 1989, Proc. IEEE.

[3]  R. David,et al.  A study of the continuous flow model of production lines with unreliable machines and finite buffers , 1994 .

[4]  A.A. Rodriguez,et al.  Hierarchical modeling and control for re-entrant semiconductor fabrication lines: a mini-fab benchmark , 1997, 1997 IEEE 6th International Conference on Emerging Technologies and Factory Automation Proceedings, EFTA '97.

[5]  D. Grant Fisher,et al.  A state space formulation for model predictive control , 1989 .

[6]  Franco Blanchini,et al.  Least inventory control of multistorage systems with non-stochastic unknown inputs , 1997, IEEE Trans. Robotics Autom..

[7]  A.A. Rodriguez,et al.  Hierarchical modeling and control of re-entrant semiconductor manufacturing facilities , 1996, Proceedings of 35th IEEE Conference on Decision and Control.

[8]  Jeff S. Shamma,et al.  Receding horizon control for manufacturing systems , 1997, Proceedings of the 1997 American Control Conference (Cat. No.97CH36041).

[9]  Reha Uzsoy,et al.  A REVIEW OF PRODUCTION PLANNING AND SCHEDULING MODELS IN THE SEMICONDUCTOR INDUSTRY PART I: SYSTEM CHARACTERISTICS, PERFORMANCE EVALUATION AND PRODUCTION PLANNING , 1992 .

[10]  I. Lefkowitz,et al.  Multilevel Approach Applied to Control System Design , 1966 .

[11]  Pravin K. Johri,et al.  Practical issues in scheduling and dispatching in semiconductor wafer fabrication , 1993 .

[12]  Stanley B. Gershwin,et al.  Manufacturing Systems Engineering , 1993 .

[13]  M. Dahleh,et al.  Control of Uncertain Systems: A Linear Programming Approach , 1995 .

[14]  Karl G. Kempf Simulating semiconductor manufacturing systems: successes, failures, and deep questions , 1996, Winter Simulation Conference.

[15]  C. R. Cutler,et al.  Optimal Solution of Dynamic Matrix Control with Linear Programing Techniques (LDMC) , 1985, 1985 American Control Conference.

[16]  Z. Zheng Robust Control of Systems Subject to Contraints , 1995 .

[17]  J. Rawlings,et al.  The stability of constrained receding horizon control , 1993, IEEE Trans. Autom. Control..

[18]  Mark A. Shayman,et al.  A new framework for supervisory control , 1995, Proceedings of 1995 American Control Conference - ACC'95.

[19]  Reha Uzsoy,et al.  A review of production planning and scheduling models in the semiconductor industry , 1994 .

[20]  P.R. Kumar Scheduling semiconductor manufacturing plants , 1994, IEEE Control Systems.

[21]  Michael Nikolaou,et al.  Robust stability analysis of constrained l1‐norm model predictive control , 1993 .

[22]  Yves Dallery,et al.  Manufacturing flow line systems: a review of models and analytical results , 1992, Queueing Syst. Theory Appl..

[23]  Armando A. Rodriguez Release policy governor (RPG) for re-entrant semiconductor fabrication lines , 1997, Proceedings of the 36th IEEE Conference on Decision and Control.

[24]  J. Shamma Optimization of the l∞-induced norm under full state feedback , 1996, IEEE Trans. Autom. Control..

[25]  F.D. Vargas-Villamil,et al.  Scheduling of reentrant manufacturing lines using a model predictive control (MPC) approach , 1997, Proceedings of the 1997 American Control Conference (Cat. No.97CH36041).

[26]  Krishna Srinivasan,et al.  Evaluation of lot release policies for semiconductor manufacturing systems , 1996, Winter Simulation Conference.