Guided local search algorithm for hot strip mill scheduling problem with considering hot charge rolling
暂无分享,去创建一个
[1] Lixin Tang,et al. A multiple traveling salesman problem model for hot rolling scheduling in Shanghai Baoshan Iron & Steel Complex , 2000, Eur. J. Oper. Res..
[2] Yasuhiro Monden,et al. Toyota Production System: An Integrated Approach to Just-In-Time , 1993 .
[3] Jeff R. Wright,et al. Discrete event sequencing as a Traveling Salesman Problem , 1992 .
[4] Ian C. Parmee,et al. Optimization in industry , 2002 .
[5] Xianpeng Wang,et al. Integration of batching and scheduling for hot rolling production in the steel industry , 2008 .
[6] Gilbert Laporte,et al. What you should know about the vehicle routing problem , 2007 .
[7] Peter Cowling,et al. A flexible decision support system for steel hot rolling mill scheduling , 2003, Comput. Ind. Eng..
[8] Lixin Tang,et al. Iterated local search algorithm based on very large-scale neighborhood for prize-collecting vehicle routing problem , 2006 .
[9] Michel Gendreau,et al. The hot strip mill production scheduling problem: A tabu search approach , 1998, Eur. J. Oper. Res..
[10] R. A. Adey. Engineering Software IV , 1985 .
[11] Michel Gendreau,et al. An efficient variable neighborhood search heuristic for very large scale vehicle routing problems , 2007, Comput. Oper. Res..
[12] Lixin Tang,et al. A review of planning and scheduling systems and methods for integrated steel production , 2001, Eur. J. Oper. Res..
[13] C. Voudouris,et al. Partial Constraint Satisfaction Problems and Guided Local Search , 1996 .
[14] Mark H. Houck,et al. An Application of Systems Modelling in Steel Production Scheduling , 1985 .