Balancing Lexicographic Multi-Objective Assembly Lines with Multi-Manned Stations
暂无分享,去创建一个
[1] Armin Scholl,et al. Balancing assembly lines with variable parallel workplaces: Problem definition and effective solution procedure , 2009, Eur. J. Oper. Res..
[2] A Sedighi,et al. A cost-oriented model for balancing mixed-model assembly lines with multi-manned workstations , 2013 .
[3] Bilal Toklu,et al. A priority rule-based constructive heuristic and an improvement method for balancing assembly lines with parallel multi-manned workstations , 2015 .
[4] Alexandre Dolgui,et al. Robust balancing of straight assembly lines with interval task times , 2013, J. Oper. Res. Soc..
[5] Yonah Wilamowsky,et al. Optimization in Multiple-objective Linear Programming Problems with Pre-emptive Priorities , 1990 .
[6] Armin Scholl,et al. Balancing and Sequencing of Assembly Lines , 1995 .
[7] Wayne L. Winston. Operations research: applications and algorithms / Wayne L. Winston , 2004 .
[8] Emre Cevikcan,et al. A team-oriented design methodology for mixed model assembly systems , 2009, Comput. Ind. Eng..
[9] P. Sivasankaran,et al. Literature review of assembly line balancing problems , 2014 .
[10] Vahid Yazdanparast,et al. Multi-manned production Lines with labor Concentration , 2011 .
[11] Bilal Toklu,et al. Multiple-criteria decision-making in two-sided assembly line balancing: A goal programming and a fuzzy goal programming models , 2009, Comput. Oper. Res..
[12] A. Charnes. Management Model And Industrial Application Of Linear Programming , 1961 .
[13] Pierre Hansen,et al. Variable Neighborhood Decomposition Search , 1998, J. Heuristics.
[14] C. L. Moodie,et al. A HEURISTIC METHOD OF ASSEMBLY LINE BALANCING FOR ASSUMPTIONS OF CONSTANTOR VARIABLE WORK ELEMENT TIMES , 1964 .
[15] Mitsuo Gen,et al. U-shaped assembly line balancing problem with genetic algorithm , 2008 .
[16] James R. Jackson,et al. A Computing Procedure for a Line Balancing Problem , 1956 .
[17] Hadi Gökçen,et al. Binary integer formulation for mixed-model assembly line balancing problem , 1998 .
[18] Subhash C. Sarin,et al. A survey of the assembly line balancing procedures , 1998 .
[19] Fred McLanahan Tonge,et al. A heuristic program for assembly line balancing , 1961 .
[20] Pierre Hansen,et al. Variable neighborhood search: Principles and applications , 1998, Eur. J. Oper. Res..
[21] Nenad Mladenović,et al. An Introduction to Variable Neighborhood Search , 1997 .
[22] Sotirios G. Dimitriadis,et al. Assembly line balancing and group working: A heuristic procedure for workers' groups operating on the same product and workstation , 2006, Comput. Oper. Res..
[23] Amaia Lusa,et al. A survey of the literature on the multiple or parallel assembly line balancing problem , 2008 .
[24] Pierre Hansen,et al. Variable neighbourhood search: methods and applications , 2010, Ann. Oper. Res..
[25] J. J. Bartholdi,et al. Balancing two-sided assembly lines: a case study , 1993 .
[26] Parviz Fattahi,et al. A mathematical model and ant colony algorithm for multi-manned assembly line balancing problem , 2011 .
[27] Michael Pinedo,et al. Scheduling: Theory, Algorithms, and Systems , 1994 .
[28] Bilal Toklu,et al. An efficient branch and bound algorithm for assembly line balancing problems with parallel multi-manned workstations , 2012, Comput. Oper. Res..
[29] Armin Scholl,et al. A survey on problems and methods in generalized assembly line balancing , 2006, Eur. J. Oper. Res..