Determining the optimal lot size for the finite production model with an imperfect rework process of defective items
暂无分享,去创建一个
[1] Meir J. Rosenblatt,et al. Simultaneous determination of production cycle and inspection schedules in a production system , 1987 .
[2] R L Schwaller. EOQ UNDER INSPECTION COSTS , 1988 .
[3] Meir J. Rosenblatt,et al. Economic Production Cycles with Imperfect Production Processes , 1986 .
[4] M. K. Salameh,et al. Economic production quantity model for items with imperfect quality , 2000 .
[5] Singa PWang Chiu,et al. An economic production quantity model with the rework process of repairable defective items , 2003 .
[6] T.C.E. Cheng,et al. An Economic Order Quantity Model with Demand-Dependent Unit Production Cost and Imperfect Production Processes , 1991 .
[7] R. J. Tersine. Principles of inventory and materials management , 1982 .
[8] P. A. Hayek,et al. Production lot sizing with the reworking of imperfect quality items produced , 2001 .
[9] Ping Yang,et al. Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs , 1996 .
[10] Jerome S. Osteryoung,et al. Use of the EOQ model for inventory analysis , 1986 .
[11] Xin Zhang,et al. Joint lot sizing and inspection policy in an EOQ model with random yield , 1990 .
[12] David F. Pyke,et al. Inventory management and production planning and scheduling , 1998 .
[13] Kun-Jen Chung. Bounds for production lot sizing with machine breakdowns , 1997 .