Maintaining sustainable performance in operating petroleum assets via a lean-six-sigma approach

Purpose This paper aims to demonstrate the possibility of maintaining triple bottom line (TBL) sustainable performance in the petroleum industry via a case study. In particular, it presents the utilization of a lean-six-sigma (LSS) concept for investigating one of the underperforming support service activities in an engineering contractor (EC) and to indicate how LSS concepts enable the barriers to maintaining sustainable petroleum operations to be reduced for maintaining sustainable petroleum operations. Design/methodology/approach A case study has been carried out in an EC organization in relation to one of the support services (i.e. valves requisition process [VRP]) to demonstrate how LSS concepts enable the barriers to maintaining sustainable petroleum operations to be reduced for maintaining sustainable petroleum operations. Value stream mapping (VSM) and value stream analysis (VSA) have been utilized to investigate the barriers that inhibit sustainable operations. VSM and VSA have been performed to investigate the underperforming activities in the selected support service (i.e. VRP) using a current state map. After performing VSA, a future state map has been developed, indicating possible improvements in overall TBL sustainable performance. Findings VSM and VSA enable the barriers to maintaining TBL sustainable operations in the petroleum industry to be investigated, while minimizing waste in the ECs and asset owners’ organizations. Research limitations/implications The study has been limited to ECs’ support services, which have been delivered based on asset operators’ requirements. Practical implications The suggested LSS approach and related analysis help practicing engineers to perform similar analysis for different engineering support services. Improved performance in support service results minimize health, safety and environmental challenges in asset operations, and the resulting waste reduction increases the return on investments. Social implications Effective delivery of the assessments minimizes potential delays in projects related to petroleum operations, mitigating future accidents. It enhances the TBL sustainable performance of an asset-intensive industrial organization. Originality/value This manuscript addresses the inherent TBL sustainable performance challenges in the petroleum industry that have been caused by delayed projects. The responsibilities of projects’ delivery are mainly attributed to ECs. The EC organizations are operating in project mode, and projects delays are inherently caused by the frequently changing nature of: operators’ requirements; suppliers’ and/or manufacturers’ capabilities and restrictions; and lack of standardization in documentation and work processes (i.e. because of different engineering projects’ demands). Hence, this manuscript illustrates a methodology to demonstrate the possibility of TBL sustainable performance improvement in the petroleum industry via a case study (i.e. VRP-related project delivery performance improvement) in an EC organization utilizing the lean concept.

[1]  A. R. Rahani,et al.  Production Flow Analysis through Value Stream Mapping: A Lean Manufacturing Process Case Study , 2012 .

[2]  R. M. Chandima Ratnayake,et al.  Performance improvement of oil and gas industry via lean concept: A case study from valves requisition , 2015, 2015 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM).

[3]  D. Remenyi Achieving maximum value from information systems , 1997 .

[4]  Jose Arturo Garza-Reyes,et al.  Green lean and the need for Six Sigma , 2015 .

[5]  Dorota Stadnicka,et al.  Development of a rule base and algorithm for a quotation preparation process: A case study with a VSM approach , 2015, 2015 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM).

[6]  R. M. Chandima Ratnayake,et al.  Technical integrity management: measuring HSE awareness using AHP in selecting a maintenance strategy , 2010 .

[7]  Jean Hartley,et al.  Case study research , 2004 .

[8]  Joseph C. Chen,et al.  Value Stream Management for Lean Office—A Case Study , 2012 .

[9]  Gerhard Johannes Plenert,et al.  Reinventing Lean: Introducing Lean Management into the Supply Chain , 2006 .

[10]  Lyn Arscott Sustainable Development in the Oil and Gas Industry , 2003 .

[11]  Remon F. Aziz,et al.  Applying lean thinking in construction and performance improvement , 2013 .

[12]  R. M. Chandima Ratnayake,et al.  Sustainable performance of industrial assets: the role of PAS 55-1&2 and human factors , 2013 .

[13]  Kim Hua Tan,et al.  Green as the new Lean: how to use Lean practices as a catalyst to greening your supply chain , 2013 .

[14]  R. M. Chandima Ratnayake,et al.  Translating sustainability concerns at plant level asset operations: industrial performance assessment , 2012 .

[15]  Jose Arturo Garza-Reyes,et al.  Lean and green – a systematic review of the state of the art literature , 2015 .

[16]  A. Leonard,et al.  Project portfolio management implementation pitfalls , 2010 .

[17]  Andrew Savitz,et al.  The Triple Bottom Line: How Today's Best-Run Companies Are Achieving Economic, Social and Environmental Success -- and How You Can Too , 2006 .

[18]  J. Elkington Towards the Sustainable Corporation: Win-Win-Win Business Strategies for Sustainable Development , 1994 .

[19]  Jose Arturo Garza-Reyes,et al.  Lean and Green - Synergies, Differences, Limitations, and the Need for Six Sigma , 2014, APMS.

[20]  E. Rauch,et al.  Implementation of Lean Production in Small Sized Enterprises , 2013 .

[21]  B. Vijaya Ramnath,et al.  Application of Value Stream Mapping for Reduction of Cycle Time in a Machining Process , 2014 .

[22]  Ephrem Eyob,et al.  Customer-Oriented Global Supply Chains: Concepts for Effective Management , 2012 .

[23]  Dorota Stadnicka,et al.  Simple approach for Value Stream Mapping for business process analysis , 2015, 2015 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM).

[24]  Mohd Shahir Yahya,et al.  Production Improvement in an Aircraft Manufacturing Company Using Value Stream Mapping Approach , 2014 .