Possibilistic Moments for the Task Duration in Fuzzy PERT
暂无分享,去创建一个
[1] D. Malcolm,et al. Application of a Technique for Research and Development Program Evaluation , 1959 .
[2] Chengdong Wu,et al. The rough set theory and applications , 2004 .
[3] Albert P.C. Chan,et al. Fuzzy set theory approach for measuring the performance of relationship-based construction projects in Australia , 2012 .
[4] Jiuping Xu,et al. Control Risk for Multimode Resource-Constrained Project Scheduling Problems under Hybrid Uncertainty , 2015 .
[5] Heinrich Rommelfanger. Network analysis and information flow in fuzzy environment , 1994 .
[6] Aerambamoorthy Thavaneswaran,et al. Fuzzy random‐coefficient volatility models with financial applications , 2006 .
[7] Basil K. Papadopoulos,et al. Approaching activity duration in PERT by means of fuzzy sets theory and statistics , 2014, J. Intell. Fuzzy Syst..
[8] D. Dubois,et al. The mean value of a fuzzy number , 1987 .
[9] T. Ross. Fuzzy Logic with Engineering Applications , 1994 .
[10] Murat Gunduz,et al. Fuzzy Assessment Model to Estimate the Probability of Delay in Turkish Construction Projects , 2015 .
[11] Ming Lu. Enhancing Project Evaluation and Review Technique Simulation through Artificial Neural Network-based Input Modeling , 2002 .
[12] Qiming Li,et al. Performance Objectives Selection Model in Public-Private Partnership Projects Based on the Perspective of Stakeholders , 2010 .
[13] Basil K. Papadopoulos,et al. Hybrid (fuzzy-stochastic) modelling in construction operations management , 2013, Int. J. Mach. Learn. Cybern..
[14] A. Thavaneswaran,et al. Option valuation model with adaptive fuzzy numbers , 2007, Comput. Math. Appl..
[15] S. Chanas,et al. THE USE OF FUZZY VARIABLES IN PERT , 1981 .
[16] Konstantinos A. Chrysafis,et al. On theoretical pricing of options with fuzzy estimators , 2009 .
[17] Christer Carlsson,et al. On Possibilistic Mean Value and Variance of Fuzzy Numbers , 1999, Fuzzy Sets Syst..
[18] Margaret F. Shipley,et al. BIFPET methodology versus PERT in project management: fuzzy probability instead of the beta distribution , 1997 .
[19] Igor Gazdik. Fuzzy-Network Planning - FNET , 1983, IEEE Transactions on Reliability.
[20] Michael Hanss,et al. Applied Fuzzy Arithmetic: An Introduction with Engineering Applications , 2004 .
[21] Didier Dubois,et al. On latest starting times and floats in activity networks with ill-known durations , 2003, Eur. J. Oper. Res..
[22] Ronald R. Yager,et al. Operations on fuzzy numbers via fuzzy reasoning , 1997, Fuzzy Sets Syst..
[23] M. Shimura. Fuzzy sets concept in rank-ordering objects , 1973 .
[24] José Ramón,et al. Critical Path Definition Using Multicriteria Decision Making: PROMETHEE Method , 2013 .
[25] James T. O'Connor,et al. Characteristics for Leveraging Value Management Processes on Capital Facility Projects , 2006 .
[26] R. Goetschel,et al. Elementary fuzzy calculus , 1986 .
[27] Garyfalos Papaschinopoulos,et al. On the fuzzy difference equations of finance , 2008, Fuzzy Sets Syst..
[28] D. Dubois,et al. Operations on fuzzy numbers , 1978 .
[29] Lotfi A. Zadeh,et al. Fuzzy Sets , 1996, Inf. Control..
[30] Erik Demeulemeester,et al. Project scheduling : a research handbook , 2002 .
[31] George J. Klir,et al. Fuzzy sets and fuzzy logic - theory and applications , 1995 .
[32] Konstantinos A. Chrysafis,et al. Corporate investment appraisal with possibilistic CAPM , 2012, Mathematical and computer modelling.
[33] Chen-Tung Chen,et al. Applying fuzzy method for measuring criticality in project network , 2007, Inf. Sci..
[34] Simaan M. AbouRizk,et al. FITTING BETA DISTRIBUTIONS BASED ON SAMPLE DATA , 1994 .