The Monitoring of Project Car Dumper Shed of A Coal Terminal
暂无分享,去创建一个
Diaphragm wall is completed in the underground depth by section construction,which can not observe quality character directly.If there exists some disadvantage,it is very difficult to repair.Based on the actual observation data of the retaining structure for the foundation pit,some useful conclusions are drawn through the analysis of the monitoring results including lateral displacement of diaphragm wall,horizontal displacement of the top of the wall,vertical settlement of the wall,pore water pressure,earth pressure and the internal force for diaphragm wall.These conclusions can be used for reference for the design,construction and monitoring of similar engineering.