Dynamic operator assignment based on shifting machine loading
暂无分享,去创建一个
[1] R. Faure,et al. Introduction to operations research , 1968 .
[2] Keytack H. Oh. The computerized operator-machine system (OMS) for the least cost combination of operators and machines , 1996 .
[3] Pravin K. Johri,et al. Practical issues in scheduling and dispatching in semiconductor wafer fabrication , 1993 .
[4] Lawrence M. Wein,et al. Scheduling semiconductor wafer fabrication , 1988 .
[5] Kathryn E. Stecke,et al. REVIEW OF OPERATOR/MACHINE INTERFERENCE MODELS. , 1985 .
[6] Gürsel A. Süer. Optimal operator assignment and cell loading in labor-intensive manufacturing cells , 1996 .
[7] F. S. Hillier,et al. Introduction to Operations Research, 10th ed. , 1986 .
[8] Geetha Srinivasan,et al. Heuristics for operator allocation and sequencing in product-line-cells with manually operated machines , 1997 .
[9] P. Schroeder. The Goal: A Process of Ongoing Improvement , 1994 .
[10] Reha Uzsoy,et al. A REVIEW OF PRODUCTION PLANNING AND SCHEDULING MODELS IN THE SEMICONDUCTOR INDUSTRY PART I: SYSTEM CHARACTERISTICS, PERFORMANCE EVALUATION AND PRODUCTION PLANNING , 1992 .
[11] Geetha Srinivasan,et al. Heuristics for operator allocation and sequencing in just-in-time flow line manufacturing cell , 1995 .
[12] Reha Uzsoy,et al. A review of production planning and scheduling models in the semiconductor industry , 1994 .
[13] David L. Woodruff,et al. CONWIP: a pull alternative to kanban , 1990 .
[14] R. Meyer,et al. The Fundamental Theorem of Exponential Smoothing , 1961 .
[15] Moshe Eben-Chaime,et al. The queuing theory machine interference model: use and application , 1995 .
[16] Robert C. Leachman. Closed-loop measurement of equipment efficiency and equipment capacity , 1997 .
[17] D.S. O'Ferrell,et al. Manufacturing modeling and optimization , 1995, Proceedings of SEMI Advanced Semiconductor Manufacturing Conference and Workshop.
[18] Hanif D. Sherali,et al. Linear Programming and Network Flows , 1977 .