Disaggregation to a rolling horizon master production schedule with minimum batch-size production restrictions
暂无分享,去创建一个
[1] Terry R. Rakes,et al. Aggregate production planning using chance-constrained goal programming , 1984 .
[2] R. C. Carlson,et al. Less Nervous MRP Systems: A Dynamic Economic Lot-Sizing Approach , 1979 .
[3] Urban Wemmerlöv,et al. Lot-sizing under uncertainty in a rolling schedule environment , 1984 .
[4] V. Sridharan,et al. Master production scheduling make-to-stock products: a framework for analysis , 1990 .
[5] Michael David Oliff,et al. An Integrated Production Planning Model for Multiproduct Parallel Processor Environments , 1982 .
[6] Nick T. Thomopoulos,et al. Applied Forecasting Methods , 1980 .
[7] Michael D. Oliff. Disaggregate Planning For Parallel Processors , 1987 .
[8] A. G. Lockett,et al. A problem of aggregate scheduling An application of goal programming , 1978 .
[9] Dean H. Kropp,et al. HEURISTIC LOT‐SIZING APPROACHES FOR DEALING WITH MRP SYSTEM NERVOUSNESS , 1983 .
[10] Suresh Chand,et al. A NOTE ON DYNAMIC LOT SIZING IN A ROLLING-HORIZON ENVIRONMENT , 1982 .
[11] R. P. Mohanty,et al. Hierarchical production planning: Comparison of some heuristics , 1987 .
[12] de Ag Ton Kok. Hierarchical production planning for consumer goods , 1990 .
[13] Keith G. Lockyer,et al. A practical approach to production scheduling , 1979 .
[14] Hitoshi Tsubone,et al. A hierarchical production planning system in the motor industry , 1987 .
[15] B. P. Dzielinski,et al. Optimal Programming of Lot Sizes, Inventory and Labor Allocations , 1965 .
[16] William G. Sullivan. A review of: “APPLIED FORECASTING METHODS” by N. T. Thomopoulos, Prentice-Hall, Inc., Englewood Cliffs, New Jersey, iiv + 369 pages, list $24.50 , 1979 .
[17] H. Jönsson,et al. Aggregation and Disaggregation in Hierarchical Production Planning , 1984 .
[18] David A. Goodman,et al. A Goal Programming Approach to Aggregate Planning of Production and Work Force , 1974 .
[19] V. Sridharan,et al. Freezing the Master Production Schedule Under Rolling Planning Horizons , 1987 .
[20] K. Aardal,et al. A Benders decomposition based heuristic for the hierarchical production planning problem , 1990 .
[21] Larry P. Ritzman,et al. Disaggregation, problems in manufacturing and service organizations , 1979 .
[22] Everett E. Adam,et al. Forecasting error evaluation in material requirements planning (MRP) production-inventory systems , 1986 .
[23] Neng-Pai Lin,et al. A Model for Master Production Scheduling in Uncertain Environments , 1992 .
[24] Robert E. Markland,et al. Integer goal programming for multistage lot sizing: Experimentation and implementation , 1985 .
[25] Gabriel R. Bitran,et al. ON THE DESIGN OF HIERARCHICAL PRODUCTION PLANNING SYSTEMS , 1977 .
[26] Joseph D. Blackburn,et al. HEURISTIC LOT‐SIZING PERFORMANCE IN A ROLLING‐SCHEDULE ENVIRONMENT* , 1980 .
[27] Thomas L. Magnanti,et al. Applied Mathematical Programming , 1977 .
[28] Robert E. Markland,et al. Improved hierarchical production planning , 1989 .
[29] Marc J. Schniederjans,et al. Multi-product production planning: A goal programming approach , 1985 .
[30] C. Hwang,et al. An aggregate production planning model and application of three multiple objective decision methods , 1980 .
[31] Tan Miller,et al. A Hierarchical Production Planning System , 1985 .
[32] S. Graves. Using Lagrangean Techniques to Solve Hierarchical Production Planning Problems , 1982 .
[33] K. Lawrence,et al. A multiple goal linear programming model for coordinated production and logistics planning , 1976 .
[34] Lee J. Krajewski,et al. Disaggregation in manufacturing and service organizations: survey of problems and research , 1977 .
[35] Sven Axsäter,et al. Disaggregation under Uncertainty in Hierarchical Production Planning , 1988 .
[36] Dean H. Kropp,et al. THE EFFECTIVENESS OF EXTENDING THE HORIZON IN ROLLING PRODUCTION SCHEDULING , 1982 .
[37] V. Sridharan,et al. Freezing the Master Production Schedule Under Demand Uncertainty , 1990 .
[38] William L. Berry,et al. MEASURING MASTER PRODUCTION SCHEDULE STABILITY UNDER ROLLING PLANNING HORIZONS , 1988 .
[39] Chen-Hua Chung,et al. Planning horizons for master production scheduling , 1984 .
[40] Kenneth R. Baker,et al. AN EXPERIMENTAL STUDY OF THE EFFECTIVENESS OF ROLLING SCHEDULES IN PRODUCTION PLANNING , 1977 .
[41] K. Zoller. Optimal Disaggregation of Aggregate Production Plans , 1971 .
[42] Alan S. Manne,et al. Programming of Economic Lot Sizes , 1958 .
[43] James P. Jarvis,et al. A Hierarchical Production Planning and Scheduling Model , 1992 .
[44] Veikko Jääskeläinen,et al. A Goal Programming Model of Aggregate Production Planning , 1969 .
[45] E. Newson. Multi-Item Lot Size Scheduling by Heuristic Part I: With Fixed Resources , 1975 .
[46] E. Newson. Multi-Item Lot Size Scheduling by Heuristic Part II: With Variable Resources , 1975 .
[47] Gerard M. Campbell. Master Production Scheduling Under Rolling Planning Horizons with Fixed Order Intervals , 1992 .
[48] Chen-Hua Chung,et al. Notes and Communications REPLANNING FREQUENCIES FOR MASTER PRODUCTION SCHEDULES , 1986 .
[49] Juan J. Gonzalez,et al. Master production scheduling: a multiple-objective linear programming approach , 1983 .
[50] Leon S. Lasdon,et al. An Efficient Algorithm for Multi-Item Scheduling , 1971, Oper. Res..
[51] Robert E. Markland,et al. Master Scheduling in Assemble‐To‐Order Environments: A Capacitated Multiobjective Lot‐Sizing Model , 1992 .