Disaggregation to a rolling horizon master production schedule with minimum batch-size production restrictions

Building on previous research in the area of hierarchical production planning and rolling schedules, this paper is concerned with the disaggregation of aggregate plans to a rolling horizon master production schedule when production lot-sizes require minimum batch-size production. Actual data from a process industry firm is used to test and validate the proposed rolling horizon master production scheduling model. The paper also examines the impact of forecast windows on the performance of a rolling schedule when production quantities of individual product items are based on minimum batch-size production. Results indicate that the model's performance is superior to actual company performance in terms of total cost and increasing the length of the forecast window can increase costs.

[1]  Terry R. Rakes,et al.  Aggregate production planning using chance-constrained goal programming , 1984 .

[2]  R. C. Carlson,et al.  Less Nervous MRP Systems: A Dynamic Economic Lot-Sizing Approach , 1979 .

[3]  Urban Wemmerlöv,et al.  Lot-sizing under uncertainty in a rolling schedule environment , 1984 .

[4]  V. Sridharan,et al.  Master production scheduling make-to-stock products: a framework for analysis , 1990 .

[5]  Michael David Oliff,et al.  An Integrated Production Planning Model for Multiproduct Parallel Processor Environments , 1982 .

[6]  Nick T. Thomopoulos,et al.  Applied Forecasting Methods , 1980 .

[7]  Michael D. Oliff Disaggregate Planning For Parallel Processors , 1987 .

[8]  A. G. Lockett,et al.  A problem of aggregate scheduling An application of goal programming , 1978 .

[9]  Dean H. Kropp,et al.  HEURISTIC LOT‐SIZING APPROACHES FOR DEALING WITH MRP SYSTEM NERVOUSNESS , 1983 .

[10]  Suresh Chand,et al.  A NOTE ON DYNAMIC LOT SIZING IN A ROLLING-HORIZON ENVIRONMENT , 1982 .

[11]  R. P. Mohanty,et al.  Hierarchical production planning: Comparison of some heuristics , 1987 .

[12]  de Ag Ton Kok Hierarchical production planning for consumer goods , 1990 .

[13]  Keith G. Lockyer,et al.  A practical approach to production scheduling , 1979 .

[14]  Hitoshi Tsubone,et al.  A hierarchical production planning system in the motor industry , 1987 .

[15]  B. P. Dzielinski,et al.  Optimal Programming of Lot Sizes, Inventory and Labor Allocations , 1965 .

[16]  William G. Sullivan A review of: “APPLIED FORECASTING METHODS” by N. T. Thomopoulos, Prentice-Hall, Inc., Englewood Cliffs, New Jersey, iiv + 369 pages, list $24.50 , 1979 .

[17]  H. Jönsson,et al.  Aggregation and Disaggregation in Hierarchical Production Planning , 1984 .

[18]  David A. Goodman,et al.  A Goal Programming Approach to Aggregate Planning of Production and Work Force , 1974 .

[19]  V. Sridharan,et al.  Freezing the Master Production Schedule Under Rolling Planning Horizons , 1987 .

[20]  K. Aardal,et al.  A Benders decomposition based heuristic for the hierarchical production planning problem , 1990 .

[21]  Larry P. Ritzman,et al.  Disaggregation, problems in manufacturing and service organizations , 1979 .

[22]  Everett E. Adam,et al.  Forecasting error evaluation in material requirements planning (MRP) production-inventory systems , 1986 .

[23]  Neng-Pai Lin,et al.  A Model for Master Production Scheduling in Uncertain Environments , 1992 .

[24]  Robert E. Markland,et al.  Integer goal programming for multistage lot sizing: Experimentation and implementation , 1985 .

[25]  Gabriel R. Bitran,et al.  ON THE DESIGN OF HIERARCHICAL PRODUCTION PLANNING SYSTEMS , 1977 .

[26]  Joseph D. Blackburn,et al.  HEURISTIC LOT‐SIZING PERFORMANCE IN A ROLLING‐SCHEDULE ENVIRONMENT* , 1980 .

[27]  Thomas L. Magnanti,et al.  Applied Mathematical Programming , 1977 .

[28]  Robert E. Markland,et al.  Improved hierarchical production planning , 1989 .

[29]  Marc J. Schniederjans,et al.  Multi-product production planning: A goal programming approach , 1985 .

[30]  C. Hwang,et al.  An aggregate production planning model and application of three multiple objective decision methods , 1980 .

[31]  Tan Miller,et al.  A Hierarchical Production Planning System , 1985 .

[32]  S. Graves Using Lagrangean Techniques to Solve Hierarchical Production Planning Problems , 1982 .

[33]  K. Lawrence,et al.  A multiple goal linear programming model for coordinated production and logistics planning , 1976 .

[34]  Lee J. Krajewski,et al.  Disaggregation in manufacturing and service organizations: survey of problems and research , 1977 .

[35]  Sven Axsäter,et al.  Disaggregation under Uncertainty in Hierarchical Production Planning , 1988 .

[36]  Dean H. Kropp,et al.  THE EFFECTIVENESS OF EXTENDING THE HORIZON IN ROLLING PRODUCTION SCHEDULING , 1982 .

[37]  V. Sridharan,et al.  Freezing the Master Production Schedule Under Demand Uncertainty , 1990 .

[38]  William L. Berry,et al.  MEASURING MASTER PRODUCTION SCHEDULE STABILITY UNDER ROLLING PLANNING HORIZONS , 1988 .

[39]  Chen-Hua Chung,et al.  Planning horizons for master production scheduling , 1984 .

[40]  Kenneth R. Baker,et al.  AN EXPERIMENTAL STUDY OF THE EFFECTIVENESS OF ROLLING SCHEDULES IN PRODUCTION PLANNING , 1977 .

[41]  K. Zoller Optimal Disaggregation of Aggregate Production Plans , 1971 .

[42]  Alan S. Manne,et al.  Programming of Economic Lot Sizes , 1958 .

[43]  James P. Jarvis,et al.  A Hierarchical Production Planning and Scheduling Model , 1992 .

[44]  Veikko Jääskeläinen,et al.  A Goal Programming Model of Aggregate Production Planning , 1969 .

[45]  E. Newson Multi-Item Lot Size Scheduling by Heuristic Part I: With Fixed Resources , 1975 .

[46]  E. Newson Multi-Item Lot Size Scheduling by Heuristic Part II: With Variable Resources , 1975 .

[47]  Gerard M. Campbell Master Production Scheduling Under Rolling Planning Horizons with Fixed Order Intervals , 1992 .

[48]  Chen-Hua Chung,et al.  Notes and Communications REPLANNING FREQUENCIES FOR MASTER PRODUCTION SCHEDULES , 1986 .

[49]  Juan J. Gonzalez,et al.  Master production scheduling: a multiple-objective linear programming approach , 1983 .

[50]  Leon S. Lasdon,et al.  An Efficient Algorithm for Multi-Item Scheduling , 1971, Oper. Res..

[51]  Robert E. Markland,et al.  Master Scheduling in Assemble‐To‐Order Environments: A Capacitated Multiobjective Lot‐Sizing Model , 1992 .