Wave Overtopping Research of Huaneng Dock Phase-2 Project

Based on the unfavorable condition that the dock faces the harbor entrance,the design is studiedand optimized from the aspects of plane layout and sectional structure in order to solve wave overtopping problem.Finally,reasonable option on the drainage facilities is determined according to relevant physical model test result.