A simple formula for estimating throughput of serial production lines with variable processing times and limited buffer capacity

SUMMARY This paper develops an analytical formula for throughput (jobs per hour) of a serial production line with variable processing times and limited buffer capacity. For a line with identical workstations in series, throughput can be accurately estimated by a simple function of four parameters: mean and standard deviation of processing times, number of stations, and buffer size. Extensions of the formula to account for differences between stations are also presented. The formula allows line performance to be assessed quickly and easily with minimal data, and is useful in initial production system design.

[1]  We-Min Chow,et al.  Buffer capacity analysis for sequential production lines with variable process times , 1987 .

[2]  Sheldon M. Ross,et al.  Stochastic Processes , 2018, Gauge Integral Structures for Stochastic Calculus and Quantum Electrodynamics.

[3]  J. A. Buzacott,et al.  AUTOMATIC TRANSFER LINES WITH BUFFER STOCKS , 1967 .

[4]  Colin L. Moodie,et al.  OPTIMAL BUFFER STORAGE CAPACITY IN PRODUCTION , 1968 .

[5]  John A. Buzacott,et al.  Abandoning the moving assembly line: models of human operators and job sequencing , 1990 .

[6]  J. A. Buzacott,et al.  The role of inventory banks in flow-line production systems , 1971 .

[7]  Alvin W. Drake,et al.  Fundamentals of Applied Probability Theory , 1967 .

[8]  Stanley B. Gershwin,et al.  An Efficient Decomposition Method for the Approximate Evaluation of Tandem Queues with Finite Storage Space and Blocking , 1987, Oper. Res..

[9]  K. Knott A Study of Work-Time Distributions on Unpaced Tasks , 1987 .

[10]  Robert B. Cooper,et al.  An Introduction To Queueing Theory , 2016 .

[11]  Frederick S. Hillier,et al.  Finite Queues in Series with Exponential or Erlang Service Times - A Numerical Approach , 1966, Oper. Res..

[12]  Gordon C. Hunt,et al.  Sequential Arrays of Waiting Lines , 1956 .

[13]  R. N. Basu,et al.  The interstage buffer storage capacity of non-powered assembly lines A simple mathematical approach , 1977 .

[14]  A. D. Knott,et al.  THE INEFFICIENCY OF A SERIES OF WORK STATIONS—A SIMPLE FORMULA , 1970 .

[15]  William L. Maxwell,et al.  The Role of Work-in-Process Inventory in Serial Production Lines , 1988, Oper. Res..

[16]  Michael J. Magazine,et al.  Heuristics for determining output and work allocations in series flow lines , 1978 .

[17]  Eginhard J. Muth,et al.  The bowl phenomenon revisited , 1987 .

[18]  Eginhard J. Muth,et al.  The Throughput Rate of Multistation Production Lines with Stochastic Servers , 1987, Probability in the Engineering and Informational Sciences.

[19]  Norman A. Dudley,et al.  WORK-TIME DISTRIBUTIONS , 1963 .

[20]  N. P. Rao Two-Stage Production Systems with Intermediate Storage , 1975 .