Day-ahead resource scheduling of a renewable energy based virtual power plant

The evolution of energy markets is accelerating in the direction of a greater reliance upon distributed energy resources (DERs). To manage this increasing two-way complexity, virtual power plants (VPPs) are being deployed today all over the world. In this paper, a probabilistic model for optimal day ahead scheduling of electrical and thermal energy resources in a VPP is proposed where participation of energy storage systems and demand response programs (DRPs) are also taken into account. In the proposed model, energy and reserve is simultaneously scheduled considering the uncertainties of market prices, electrical demand and intermittent renewable power generation. The Point Estimate Method (PEM) is applied in order to model the uncertainties of VPP’s scheduling problem. Moreover, the optimal reserve scheduling of VPP is presented which efficiently decreases VPP’s risk facing the unexpected fluctuations of uncertain parameters at the power delivery time. The results demonstrated that implementation of demand response programs (DRPs) would decrease total operation costs of VPP as well as its dependency on the upstream network.

[1]  Mohammad Kazem Sheikh-El-Eslami,et al.  Decision making of a virtual power plant under uncertainties for bidding in a day-ahead market using point estimate method , 2013 .

[2]  Antonio J. Conejo,et al.  Offering model for a virtual power plant based on stochastic programming , 2013 .

[3]  S. M. Shahidehpour,et al.  Short term generation scheduling in photovoltaic-utility grid with battery storage , 1997 .

[4]  Jamshid Aghaei,et al.  Integrated day-ahead and hour-ahead operation model of discos in retail electricity markets considering DGs and CO2 emission penalty cost , 2012 .

[5]  Pedro Faria,et al.  Modified Particle Swarm Optimization Applied to Integrated Demand Response and DG Resources Scheduling , 2013, IEEE Transactions on Smart Grid.

[6]  F. Bouffard,et al.  Stochastic security for operations planning with significant wind power generation , 2008, 2008 IEEE Power and Energy Society General Meeting - Conversion and Delivery of Electrical Energy in the 21st Century.

[7]  Ozan Erdinc,et al.  An adaptive load dispatching and forecasting strategy for a virtual power plant including renewable energy conversion units , 2014 .

[8]  Jianxue Wang,et al.  Review on probabilistic forecasting of wind power generation , 2014 .

[9]  M. Tajeddini,et al.  Risk averse optimal operation of a virtual power plant using two stage stochastic programming , 2014 .

[10]  S. M. Moghaddas-Tafreshi,et al.  A review on operation of micro grids and Virtual Power Plants in the power markets , 2009, 2009 2nd International Conference on Adaptive Science & Technology (ICAST).

[11]  S. M. Moghaddas-Tafreshi,et al.  Bidding Strategy of Virtual Power Plant for Participating in Energy and Spinning Reserve Markets—Part I: Problem Formulation , 2011, IEEE Transactions on Power Systems.

[12]  A. Conejo,et al.  Market-clearing with stochastic security-part I: formulation , 2005, IEEE Transactions on Power Systems.

[13]  Enrico Tironi,et al.  A statistical approach to electrical storage sizing with application to the recovery of braking ener , 2011 .

[14]  Kevin Tomsovic,et al.  A full demand response model in co-optimized energy and reserve market , 2014 .

[15]  Peng Li,et al.  Probabilistic optimal operation management of microgrid using point estimate method and improved bat algorithm , 2014, 2014 IEEE PES General Meeting | Conference & Exposition.

[16]  Shahram Jadid,et al.  Stochastic operational scheduling of smart distribution system considering wind generation and demand response programs , 2014 .

[17]  Weiwei Miao,et al.  Hierarchical market integration of responsive loads as spinning reserve , 2013 .

[18]  M. Kurrat,et al.  Virtual power plants with combined heat and power micro-units , 2005, 2005 International Conference on Future Power Systems.

[19]  Ezio Santini,et al.  Optimization of the battery size for PV systems under regulatory rules using a Markov-Chains approach , 2016 .

[20]  Alireza Soroudi Taxonomy of Uncertainty Modeling Techniques in Renewable Energy System Studies , 2014 .

[21]  Ehab F. El-Saadany,et al.  Probabilistic approach for optimal allocation of wind-based distributed generation in distribution systems , 2011 .

[22]  Zhangjie,et al.  Control strategy of microgrid inverter operation in Grid-connected and Grid-disconnected modes , 2011 .

[23]  Shin'ya Obara,et al.  Operational planning of an independent microgrid containing tidal power generators, SOFCs, and photovoltaics , 2013 .

[24]  Marco Giuntoli,et al.  Optimized Thermal and Electrical Scheduling of a Large Scale Virtual Power Plant in the Presence of Energy Storages , 2013, IEEE Transactions on Smart Grid.

[25]  S. Chowdhury,et al.  Planned Scheduling for Economic Power Sharing in a CHP-Based Micro-Grid , 2012, IEEE Transactions on Power Systems.

[26]  I. G. Moghaddam,et al.  Risk-averse profit-based optimal operation strategy of a combined wind farm–cascade hydro system in an electricity market , 2013 .

[27]  Allen J. Wood,et al.  Power Generation, Operation, and Control , 1984 .

[28]  M. Shahidehpour,et al.  Short-term scheduling of battery in a grid-connected PV/battery system , 2005, IEEE Transactions on Power Systems.

[29]  Zita Vale,et al.  A multi-objective optimization of the active and reactive resource scheduling at a distribution level in a smart grid context , 2015 .

[30]  Danny Pudjianto,et al.  Virtual power plant and system integration of distributed energy resources , 2007 .

[31]  H. Gooi,et al.  Spinning Reserve Estimation in Microgrids , 2011 .

[32]  E.F. El-Saadany,et al.  Optimal Renewable Resources Mix for Distribution System Energy Loss Minimization , 2010, IEEE Transactions on Power Systems.

[33]  S. M. Moghaddas Tafreshi,et al.  Mathematical modeling of electrochemical storage for incorporation in methods to optimize the operational planning of an interconnected micro grid , 2010, Journal of Zhejiang University SCIENCE C.

[34]  A. Blokus-Roszkowska,et al.  Probabilistic model of district heating operation process in changeable external conditions , 2015 .

[35]  R. Belmans,et al.  Impact of residential demand response on power system operation: A Belgian case study , 2014 .

[36]  G. Sheblé,et al.  Power generation operation and control — 2nd edition , 1996 .

[37]  S. M. Moghaddas-Tafreshi,et al.  Bidding Strategy of Virtual Power Plant for Participating in Energy and Spinning Reserve Markets—Part II: Numerical Analysis , 2011, IEEE Transactions on Power Systems.

[38]  Zhang Jie,et al.  Control strategy of microgrid inverter operation in Grid-connected and Grid-disconnected modes , 2011, 2011 International Conference on Electric Information and Control Engineering.

[39]  Zita Vale,et al.  Day-ahead resource scheduling in smart grids considering Vehicle-to-Grid and network constraints , 2012 .

[40]  Behnam Mohammadi-ivatloo,et al.  Stochastic risk-constrained short-term scheduling of industrial cogeneration systems in the presence of demand response programs , 2014 .

[41]  Igor Kuzle,et al.  Virtual power plant mid-term dispatch optimization , 2013 .

[42]  Christof Wittwer,et al.  Decentralised optimisation of cogeneration in virtual power plants , 2010 .

[43]  Taher Niknam,et al.  Probabilistic energy and operation management of a microgrid containing wind/photovoltaic/fuel cell generation and energy storage devices based on point estimate method and self-adaptive gravitational search algorithm , 2012 .

[44]  Chris Marnay,et al.  Optimizing Distributed Energy Resources and Building Retrofits with the Strategic DER-CAModel , 2014 .

[45]  L. Shi,et al.  Bidding strategy of microgrid with consideration of uncertainty for participating in power market , 2014 .

[46]  Shahram Jadid,et al.  Stochastic multi-objective operational planning of smart distribution systems considering demand response programs , 2014 .