Evaluation of the Feasibility of Irrigation Storage in a Flood Detention Pond in an Agricultural Catchment in Northern Italy
暂无分享,去创建一个
[1] Renzo Rosso. Manuale di Protezione Idraulica del Territorio , 2002 .
[2] G. Guariso,et al. Optimal Flow Allocation in the Zambezi River System , 1997 .
[3] Renzo Rosso,et al. Statistics, Probability and Reliability for Civil and Environmental Engineers , 1997 .
[4] Slobodan P. Simonovic,et al. Reservoir Systems Analysis: Closing Gap between Theory and Practice , 1992 .
[5] Giorgio Guariso,et al. The Management of Lake Como: A Multiobjective Analysis , 1986 .
[6] Mohammad Karamouz,et al. Decision Support System for Monthly Operation of Hydropower Reservoirs: A Case Study , 2005 .
[7] Richard M. Shane,et al. Goal Programming Decision Support System for Multiobjective Operation of Reservoir Systems , 2001 .
[8] Marnik Vanclooster,et al. Optimal operation of multipurpose reservoirs using flexible stochastic dynamic programming , 2002, Appl. Soft Comput..
[9] Mohammad Karamouz,et al. Drought Mitigation through Long-Term Operation of Reservoirs: Case Study , 2008 .
[10] Rahman H. Khatibi,et al. Research issues on warning lead@time and synergy in flood mitigation measures , 2003 .
[11] Jenq-Tzong Shiau,et al. Derivation of Optimal Hedging Rules for a Water-supply Reservoir through Compromise Programming , 2005 .
[12] Bruce M. McEnroe,et al. Preliminary Sizing of Detention Reservoirs to Reduce Peak Discharges , 1992 .
[13] Leo R. Beard,et al. Optimizing flood control allocation for a multipurpose reservoir , 1972 .
[14] Tiao J. Chang,et al. Use of Flood-Control Reservoirs for Drought Management , 1995 .
[15] Chin-shu Liu. Flood Control Storage Allocations by Linear Programming , 1972 .
[16] K. Beven,et al. Development of a European flood forecasting system , 2003 .
[17] Jenq-Tzong Shiau. Water Release Policy Effects on the Shortage Characteristics for the Shihmen Reservoir System during Droughts , 2003 .
[18] Antonino Cancelliere,et al. An analytical formulation of return period of drought severity , 2003 .
[19] Abbas Afshar,et al. Fuzzy Rule Based Models Modification by New Data: Application to Flood Flow Forecasting , 2009 .
[20] Ahmed El-Shafie,et al. Enhancing Inflow Forecasting Model at Aswan High Dam Utilizing Radial Basis Neural Network and Upstream Monitoring Stations Measurements , 2009 .
[21] K. D. W. Nandalal,et al. Planning and management of a complex water resource system: case of Samanalawewa and Udawalawe reservoirs in the Walawe river, Sri Lanka , 2002 .
[22] J. Ganoulis,et al. Risk‐based floodplain management: A case study from Greece , 2003 .
[23] E. Antoun,et al. RUNOFF DETENTION FOR FLOOD VOLUME OR EROSION CONTROL , 1994 .