Morphology of time data management – systematic design of time data management processes as fundamental challenge in industrial engineering
暂无分享,去创建一个
Jochen Deuse | Olga Erohin | Wilfried Sihn | Peter Kuhlang | Matthias Krebs | W. Sihn | J. Deuse | P. Kuhlang | Matthias Krebs | Olga Erohin
[1] Peter Almström,et al. The productivity potential assessment method: Assessing and benchmarking the improvement potential in manufacturing systems at shop‐floor level , 2011 .
[2] Fred E. Meyers. Motion and Time Study for Lean Manufacturing , 1998 .
[3] Thimo Zahn,et al. Adaptive Configuration of a Lean Production System in Small and Medium-sized Enterprises , 2010, Prod. Eng..
[4] Christoph Picker. Prospektive Zeitbestimmung für nicht wertschöpfende Montagetätigkeiten , 2007 .
[5] George Chryssolouris,et al. Manufacturing Systems: Theory and Practice , 1992 .
[6] G. Anand,et al. Simulation model for the design of lean manufacturing systems - a case study , 2009 .
[7] Sven Hinrichsen. Arbeitsrationalisierung mittels Methoden des Industrial Engineering in Dienstleistungsbetrieben , 2007 .
[8] Bruno Lotter,et al. Montage in der industriellen Produktion , 2006 .
[9] Abbas Al-Refaie,et al. Performance evaluation and analysis of a JIT-Kanban production system with sampling inspection , 2012 .
[10] Michael A. Lombardi. Time Measurement , 1959, Nature.
[11] S. G. Deshmukh,et al. Modelling and analysis of supply chain dynamics: a High Intelligent Time (HIT) petri net based approach , 2006 .
[12] H. M. Soroush,et al. Solving the single machine scheduling problem with general job-dependent past-sequence-dependent setup times and learning effects , 2012 .
[13] Anil Mital,et al. Simplifying the product maintenance process by building ease of maintenance into the design , 2011 .
[14] Jun Duanmu,et al. Production capabilities using takt times, requirements analysis and simulation , 2012 .
[15] L. C. Pigage,et al. Motion and time study , 1954 .
[16] Ali Azadeh,et al. A hybrid computer simulation–genetic algorithm for scheduling optimisation of cargo trains with time and queue limitations , 2011 .
[17] Wilfried Sihn,et al. Methodical approach to increase productivity and reduce lead time in assembly and production-logistic processes , 2011 .
[18] Ralph Bruder,et al. The European Assembly Worksheet , 2013 .
[19] Mikell P. Groover,et al. Work systems and the methods, measurement, and management of work , 2006 .
[20] Napsiah Ismail,et al. Application of value stream mapping using simulation to decrease production lead time: a Malaysian manufacturing case , 2011 .
[21] Esa Alhoniemi,et al. Estimating printed circuit board assembly times using neural networks , 2010 .
[22] Hiroshi Nakayama,et al. A study on setting standard time using work achievement quotient , 2002 .
[23] Geoffrey Boothroyd,et al. Product design for manufacture and assembly , 1994, Comput. Aided Des..
[24] Jochen Deuse,et al. Intelligent Utilisation of Digital Databases for Assembly Time Determination in Early Phases of Product Emergence , 2012 .
[25] S. Dreyfus,et al. A Five-Stage Model of the Mental Activities Involved in Directed Skill Acquisition , 1980 .
[26] Mitchell M. Tseng,et al. A pragmatic approach to product costing based on standard time estimation , 1999 .
[27] Gisela Lanza,et al. Company-specific quantitative evaluation of lean production methods , 2011, Prod. Eng..
[28] George Kanawaty,et al. Introduction to work study , 1992 .
[29] M. Homscheid. Produktionsplanung und -steuerung , 1992 .