Morphology of time data management – systematic design of time data management processes as fundamental challenge in industrial engineering

During the last 10 to 15 years, a renaissance of industrial engineering can be observed in manufacturing industry, as well as in scientific research. As a consequence, time and motion studies (TMS) become more important again. During the downturn of methodical approaches in industrial engineering in the 1980s, TMS-related competencies were lost in industry. Many companies are still missing the know-how for establishing a proper time data management (TDM). This paper presents a morphology of time data management (MoTDM), which was developed in order to create a comprehensive view on the processes of TDM as well as to detect relevant areas of improvement. The MoTDM can be used to optimise TDM processes within a company and also acts as scientific fundament for research in the field of industrial engineering.

[1]  Peter Almström,et al.  The productivity potential assessment method: Assessing and benchmarking the improvement potential in manufacturing systems at shop‐floor level , 2011 .

[2]  Fred E. Meyers Motion and Time Study for Lean Manufacturing , 1998 .

[3]  Thimo Zahn,et al.  Adaptive Configuration of a Lean Production System in Small and Medium-sized Enterprises , 2010, Prod. Eng..

[4]  Christoph Picker Prospektive Zeitbestimmung für nicht wertschöpfende Montagetätigkeiten , 2007 .

[5]  George Chryssolouris,et al.  Manufacturing Systems: Theory and Practice , 1992 .

[6]  G. Anand,et al.  Simulation model for the design of lean manufacturing systems - a case study , 2009 .

[7]  Sven Hinrichsen Arbeitsrationalisierung mittels Methoden des Industrial Engineering in Dienstleistungsbetrieben , 2007 .

[8]  Bruno Lotter,et al.  Montage in der industriellen Produktion , 2006 .

[9]  Abbas Al-Refaie,et al.  Performance evaluation and analysis of a JIT-Kanban production system with sampling inspection , 2012 .

[10]  Michael A. Lombardi Time Measurement , 1959, Nature.

[11]  S. G. Deshmukh,et al.  Modelling and analysis of supply chain dynamics: a High Intelligent Time (HIT) petri net based approach , 2006 .

[12]  H. M. Soroush,et al.  Solving the single machine scheduling problem with general job-dependent past-sequence-dependent setup times and learning effects , 2012 .

[13]  Anil Mital,et al.  Simplifying the product maintenance process by building ease of maintenance into the design , 2011 .

[14]  Jun Duanmu,et al.  Production capabilities using takt times, requirements analysis and simulation , 2012 .

[15]  L. C. Pigage,et al.  Motion and time study , 1954 .

[16]  Ali Azadeh,et al.  A hybrid computer simulation–genetic algorithm for scheduling optimisation of cargo trains with time and queue limitations , 2011 .

[17]  Wilfried Sihn,et al.  Methodical approach to increase productivity and reduce lead time in assembly and production-logistic processes , 2011 .

[18]  Ralph Bruder,et al.  The European Assembly Worksheet , 2013 .

[19]  Mikell P. Groover,et al.  Work systems and the methods, measurement, and management of work , 2006 .

[20]  Napsiah Ismail,et al.  Application of value stream mapping using simulation to decrease production lead time: a Malaysian manufacturing case , 2011 .

[21]  Esa Alhoniemi,et al.  Estimating printed circuit board assembly times using neural networks , 2010 .

[22]  Hiroshi Nakayama,et al.  A study on setting standard time using work achievement quotient , 2002 .

[23]  Geoffrey Boothroyd,et al.  Product design for manufacture and assembly , 1994, Comput. Aided Des..

[24]  Jochen Deuse,et al.  Intelligent Utilisation of Digital Databases for Assembly Time Determination in Early Phases of Product Emergence , 2012 .

[25]  S. Dreyfus,et al.  A Five-Stage Model of the Mental Activities Involved in Directed Skill Acquisition , 1980 .

[26]  Mitchell M. Tseng,et al.  A pragmatic approach to product costing based on standard time estimation , 1999 .

[27]  Gisela Lanza,et al.  Company-specific quantitative evaluation of lean production methods , 2011, Prod. Eng..

[28]  George Kanawaty,et al.  Introduction to work study , 1992 .

[29]  M. Homscheid Produktionsplanung und -steuerung , 1992 .