The ITER EC H&CD upper launcher: EM disruption analyses

Abstract In the frame of the new grant started in November 2011 between Fusion for Energy (F4E) and the ECHUL-CA consortium, the development process of the Electron Cyclotron Heating and Current Drive (EC H&CD) upper launcher (UL) in ITER has moved a step toward the final design phase. Based on the 2009 preliminary design review version, the new configuration of the UL now features a thicker single-wall mainframe (up to 90 mm), a recessed first wall panel (100 mm, to reduce the impact of halo currents) and a new arrangement of the internal shield blocks. The main design drivers for the structural components are still the electromagnetic (EM) loads, which need to be reassessed for the new configuration of the UL. In this paper the results of a new EM 20° sector model of ITER, specialized for the UL, are shown. Six different disruption scenarios are considered in this work: upward linear (36 ms) and exponential (36 ms) vertical displacement events (VDE), upward linear (36 ms) and exponential (16 ms) major disruptions (MD), category II upward slow and slow–fast VDEs. Comparing the analyses’ results allowed to define a set of structural loads to be used as a reference for the forthcoming structural calculations.