SEM-PLS Analysis of Inhibiting Factors of Cost Performance for Large Construction Projects in Malaysia: Perspective of Clients and Consultants

This study uncovered inhibiting factors to cost performance in large construction projects of Malaysia. Questionnaire survey was conducted among clients and consultants involved in large construction projects. In the questionnaire, a total of 35 inhibiting factors grouped in 7 categories were presented to the respondents for rating significant level of each factor. A total of 300 questionnaire forms were distributed. Only 144 completed sets were received and analysed using advanced multivariate statistical software of Structural Equation Modelling (SmartPLS v2). The analysis involved three iteration processes where several of the factors were deleted in order to make the model acceptable. The result of the analysis found that R 2 value of the model is 0.422 which indicates that the developed model has a substantial impact on cost performance. Based on the final form of the model, contractor's site management category is the most prominent in exhibiting effect on cost performance of large construction projects. This finding is validated using advanced techniques of power analysis. This vigorous multivariate analysis has explicitly found the significant category which consists of several causative factors to poor cost performance in large construction projects. This will benefit all parties involved in construction projects for controlling cost overrun.

[1]  M. Kenward,et al.  An Introduction to the Bootstrap , 2007 .

[2]  Jacob Cohen Statistical Power Analysis for the Behavioral Sciences , 1969, The SAGE Encyclopedia of Research Design.

[3]  Barbara M. Byrne,et al.  Structural equation modeling with EQS : basic concepts, applications, and programming , 2000 .

[4]  Marko Sarstedt,et al.  An assessment of the use of partial least squares structural equation modeling in marketing research , 2012 .

[5]  Edgar Erdfelder,et al.  G*Power 3: A flexible statistical power analysis program for the social, behavioral, and biomedical sciences , 2007, Behavior research methods.

[6]  W J Angelo,et al.  MEGAPROJECTS NEED MORE STUDY UP FRONT TO AVOID COST OVERRUNS , 2002 .

[7]  Shahriar Akter,et al.  An Evaluation of PLS Based Complex Models: the Roles of Power Analysis, Predictive Relevance and GoF Index , 2011, AMCIS.

[8]  E. Erdfelder,et al.  Statistical power analyses using G*Power 3.1: Tests for correlation and regression analyses , 2009, Behavior research methods.

[9]  Mohan M. Kumaraswamy,et al.  Delays and cost overruns in the construction projects in the Gaza Strip , 2009 .

[10]  Jin-Kyung Lee,et al.  Cost Overrun and Cause in Korean Social Overhead Capital Projects: Roads, Rails, Airports, and Ports , 2008 .

[11]  Diana Car-Pušić,et al.  Contracted Price Overrun as Contracted Construction Time Overrun Function , 2010 .

[12]  Benjamin O. Agajelu,et al.  Life Cycle Cost Analysis of a Diesel/Photovoltaic Hybrid Power Generating System , 2013 .

[13]  Michel Tenenhaus,et al.  PLS path modeling , 2005, Comput. Stat. Data Anal..

[14]  Jacob Cohen,et al.  Applied multiple regression/correlation analysis for the behavioral sciences , 1979 .

[15]  Rudolf R. Sinkovics,et al.  The Use of Partial Least Squares Path Modeling in International Marketing , 2009 .

[16]  M. Waris,et al.  The Cost Monitoring of Construction Projects through Earned Value Analysis , 2012 .

[17]  Mark S. Litwin,et al.  How to Measure Survey Reliability and Validity , 1995 .

[18]  N. Kartam,et al.  Delays and cost increases in the construction of private residential projects in Kuwait , 2005 .

[19]  W. Marsden I and J , 2012 .

[20]  Ajibade A. Aibinu,et al.  Using PLS-SEM technique to model construction organizations' willingness to participate in e-bidding , 2010 .

[21]  Gary David Holt,et al.  Factors influencing construction time and cost overruns on high-rise projects in Indonesia , 1997 .

[22]  C. Fornell,et al.  Evaluating structural equation models with unobservable variables and measurement error. , 1981 .

[23]  Wynne W. Chin The partial least squares approach for structural equation modeling. , 1998 .

[24]  Vincenzo Esposito Vinzi,et al.  PLS Path Modeling: From Foundations to Recent Developments and Open Issues for Model Assessment and Improvement , 2010 .

[25]  Zdenek Kotásek,et al.  I-path analysis , 1993, Proceedings ETC 93 Third European Test Conference.

[26]  Kerstin Liehr-Gobbers,et al.  Evaluation of Structural Equation Models Using the Partial Least Squares (PLS) Approach , 2010 .

[27]  Xianggui Qu,et al.  Multivariate Data Analysis , 2007, Technometrics.

[28]  Ismail Abdul Rahman,et al.  Time and cost performance of costruction projects in southern and cenrtal regions of penisular Malaysia , 2012, 2012 IEEE Colloquium on Humanities, Science and Engineering (CHUSER).

[29]  Xianhai Meng,et al.  The effect of relationship management on project performance in construction , 2012 .

[30]  Anthony C. Davison,et al.  Bootstrap Methods and Their Application , 1998 .

[31]  Oluwole Alfred Olatunji,et al.  A comparative analysis of tender sums and final costs of public construction and supply projects in Nigeria , 2008 .

[32]  Marko Sarstedt,et al.  PLS-SEM: Indeed a Silver Bullet , 2011 .

[33]  Tahir Nawaz,et al.  Cost Performance in Construction Industry of Pakistan , 2013 .

[34]  Andrew S. Chang Reasons for cost and schedule increase for engineering design projects , 2002 .

[35]  Theopisti C. Papadopoulou,et al.  Causes of cost overruns in transport infrastructure projects in Asia : Their significance and relationship with project size , 2012 .

[36]  John Hulland,et al.  Use of partial least squares (PLS) in strategic management research: a review of four recent studies , 1999 .

[37]  Henry Mwanaki Alinaitwe,et al.  Investigation into the Causes of Delays and Cost Overruns in Uganda's Public Sector Construction Projects , 2013 .