Scheduling setup changes at bottleneck facilities in semiconductor manufacturing
暂无分享,去创建一个
[1] Shu Li,et al. Minimum inventory variability schedule with applications in semiconductor fabrication , 1996 .
[2] Pravin K. Johri,et al. Practical issues in scheduling and dispatching in semiconductor wafer fabrication , 1993 .
[3] Kuo-Cheng Lin,et al. New methodology of dynamic lot dispatching: required turn rate , 1995, Seventeenth IEEE/CPMT International Electronics Manufacturing Technology Symposium. 'Manufacturing Technologies - Present and Future'.
[4] Lee Dong-Ho,et al. A SIMULATION STUDY ON LOT RELEASE CONTROL, MASK SCHEDULING, AND BATCH SCHEDULING IN SEMICONDUCTOR WAFER FABRICATION FACILITIES , 1998 .
[5] Lawrence M. Wein,et al. Scheduling semiconductor wafer fabrication , 1988 .
[6] Douglas C. Montgomery,et al. Applied Statistics and Probability for Engineers, Third edition , 1994 .
[7] Averill M. Law,et al. Simulation Modeling and Analysis , 1982 .