Dynamics of Rework in Complex Offshore Hydrocarbon Projects

Little systematic knowledge is available on the dynamics of rework in complex hydrocarbon (oil and gas) projects, despite the fact that they frequently exceed budget and schedule projections by more than 10%. To better understand pertinent issues associated with rework, twenty three in-depth interviews were undertaken with personnel from a major international oil and gas operator. The interviews sought to elicit deep individualistic knowledge about the dynamics of design changes, errors, and omissions that contributed to rework in four off-shore projects that they were involved with. Akin to previous research, the factors of poorly defined scope, unrealistic schedules, design changes, and coordination problems were identified as contributors to rework. A significant difference from previous studies, however, was that rework was expected and considered a norm. The issue at hand therefore related to ‘when and where’ rework would materialize, because it was considered that the implementation of front end loa...

[1]  Kenneth Cooper Naval Ship Production: A Claim Settled and a Framework Built , 1980 .

[2]  T. T. Soong,et al.  Reliability and safety of tension leg platforms , 1984 .

[3]  N Nordenstrom,et al.  SAFETY OF OFFSHORE STRUCTURES , 1985 .

[4]  Robert E. Melchers,et al.  Structural Reliability: Analysis and Prediction , 1987 .

[5]  Zeki Demirbilek,et al.  Tension Leg Platform: A State of the Art Review , 1989 .

[6]  M E Paté-Cornell,et al.  Organizational aspects of engineering system safety: the case of offshore platforms. , 1990, Science.

[7]  P. Senge THE FIFTH DISCIPLINE , 1997 .

[8]  D. Silverman Interpreting Qualitative Data , 1993 .

[9]  Linda J. Bellamy The influence of human factors science on safety in the offshore industry , 1994 .

[10]  R G Bea,et al.  QUALITY, RELIABILITY, HUMAN AND ORGANIZATION FACTORS IN DESIGN OF MARINE STRUCTURES , 1995 .

[11]  S. Kvale Interviews : an introduction to qualitative research interviewing , 1996 .

[12]  Charles C. Ragin,et al.  Constructing social research :the unity and diversity of method , 1996 .

[13]  Ove T. Gudmestad,et al.  Assessment of risk in the design phase of an offshore project , 1996 .

[14]  Fran Ackermann,et al.  Modeling for Litigation: Mixing Qualitative and Quantitative Approaches , 1997 .

[15]  Terry Williams,et al.  System dynamics in project management: assessing the impacts of client behaviour on project performance , 1998, J. Oper. Res. Soc..

[16]  Fran Ackermann,et al.  The role of feedback dynamics in disruption and delay on the nature of disruption and delay (D&D) in major projects , 2000, J. Oper. Res. Soc..

[17]  Stephen O. Ogunlana,et al.  Investigating the effect of initial scope establishment on the performance of a project through system dynamics modelling , 2001 .

[18]  Gerhard Ersdal,et al.  On the Risk of Structural Failure On Norwegian Offshore Installations , 2001 .

[19]  G. Hofstede Culture′s Consequences: Comparing Values, Behaviors, Institutions and Organizations Across Nations , 2001 .

[20]  M. Ellett,et al.  Introduction to qualitative research. , 2002, Gastroenterology nursing : the official journal of the Society of Gastroenterology Nurses and Associates.

[21]  Stephen O. Ogunlana,et al.  System dynamics modeling of design and build construction projects , 2002 .

[22]  Peter E.D. Love,et al.  Influence of Project Type and Procurement Method on Rework Costs in Building Construction Projects , 2002 .

[23]  Bas Buchner,et al.  Design Aspects of Green Water Loading on FPSOs , 2003 .

[24]  Jeom Kee Paik,et al.  Ultimate limit state design of steel-plated structures , 2003 .

[25]  Edward W. Merrow,et al.  Mega-field developments require special tactics, risk management , 2003 .

[26]  David J. Edwards,et al.  A rework reduction model for construction projects , 2004, IEEE Transactions on Engineering Management.

[27]  Peter E.D. Love,et al.  Forensic project management: The underlying causes of rework in construction projects , 2004 .

[28]  David N. Ford,et al.  MANAGING RISK AND UNCERTAINTY IN COMPLEX CAPITAL PROJECTS , 2004 .

[29]  Søren L. Buhl,et al.  How (In)accurate Are Demand Forecasts in Public Works Projects?: The Case of Transportation , 2005, 1303.6654.

[30]  C. Eden,et al.  Using Causal Mapping with Group Support Systems to Elicit an Understanding of Failure in Complex Projects: Some Implications for Organizational Research , 2005 .

[31]  Torgeir Moan Reliability-based management of inspection, maintenance and repair of offshore structures , 2005 .

[32]  Bruce R. Ellingwood,et al.  Mitigating Risk from Abnormal Loads and Progressive Collapse , 2006 .

[33]  Jeom Kee Paik,et al.  Ship-Shaped Offshore Installations: Ultimate Limit-State Design , 2007 .

[34]  David J. Edwards,et al.  Forensic Project Management: An Exploratory Examination of the Causal Behavior of Design-Induced Rework , 2008, IEEE Transactions on Engineering Management.

[35]  David J. Edwards,et al.  Project Pathogens: The Anatomy of Omission Errors in Construction and Resource Engineering Project , 2009, IEEE Transactions on Engineering Management.

[36]  Bon-Gang Hwang,et al.  Measuring the Impact of Rework on Construction Cost Performance , 2009 .

[37]  Peter E.D. Love,et al.  Rework in Civil Infrastructure Projects: Determination of Cost Predictors , 2010 .

[38]  Zahir Irani,et al.  Causal Discovery and Inference of Project Disputes , 2011, IEEE Transactions on Engineering Management.