Risk-Informed Performance Assessment of Construction Projects

Construction projects are struggling to reach satisfactory performance in a context full of various and many risks. Despite the long-lasting study of performance in construction no universal approaches have emerged from numerous proposals. A mainstream in dealing with this issue is benchmarking methods with the use of appropriate indicators. This research work adopts such a group of indicators that address more aspects than the usual cost, schedule, and quality considerations. Following suggestions for proper adjustments and clarifications for the appropriate use of this group of indicators, this research proceeds by introducing the risk aspect to the calculation of project performance. Identified risks are modeled through fuzzy numbers to deal with data incompleteness and then they are appropriately added to compose risk coefficients for the performance dimensions expressed through the respective indicators. Then, the overall project’s performance is calculated addressing a risk-informed performance assessment of construction projects. The whole process is tested for verification with a theoretical example. The development of a simple yet inclusive and adjustable methodological framework for risk-informed performance assessment is expected to provide practitioners with a relatively easy approach for integrating both the risk and performance management in construction.

[1]  Lawrence A. Gordon,et al.  Enterprise risk management and firm performance: A contingency perspective , 2009 .

[2]  Aminah Robinson Fayek,et al.  Modeling and evaluating construction project competencies and their relationship to project performance , 2016 .

[3]  Terje Aven,et al.  An enhanced data-analytic framework for integrating risk management and performance management , 2016, Reliab. Eng. Syst. Saf..

[4]  Terje Aven,et al.  The risk concept - historical and recent development trends , 2012, Reliab. Eng. Syst. Saf..

[5]  Mario Vanhoucke,et al.  Setting tolerance limits for statistical project control using earned value management , 2014 .

[6]  L. M. Naeni,et al.  A fuzzy approach for the earned value management , 2011 .

[7]  Adolfo López-Paredes,et al.  An extension of the EVM analysis for project monitoring: The Cost Control Index and the Schedule Control Index , 2011 .

[8]  Ofer Zwikael,et al.  Prediction of project outcome The Application of statistical methods to earned value management and earned schedule performance indexes , 2009 .

[9]  Andrew D.F. Price,et al.  Performance Measurement in Construction , 2004 .

[10]  Pablo Orihuela,et al.  Proposal of Performance Indicators for the Design of Housing Projects , 2017 .

[11]  Sou-Sen Leu,et al.  Project Performance Evaluation Based on Statistical Process Control Techniques , 2008 .

[12]  Jared S. Soileau,et al.  Does Enterprise risk management enhance operating performance , 2017 .

[13]  José Manuel Galán,et al.  A new approach for project control under uncertainty. Going back to the basics , 2014 .

[14]  Edmundas Kazimieras Zavadskas,et al.  Multi-criteria analysis of Projects' performance in construction , 2014 .

[15]  Otávio P. Sanchez,et al.  Cost and time project management success factors for information systems development projects , 2017 .

[16]  Sungmin Yun,et al.  Development of performance metrics for phase-based capital project benchmarking , 2016 .

[17]  Denis F. Cioffi,et al.  Estimating a project's earned and final duration , 2016 .

[18]  Michael K. McShane,et al.  Does Enterprise Risk Management Increase Firm Value? , 2010 .

[19]  Sara A. Lundqvist An Exploratory Study of Enterprise Risk Management , 2014 .

[20]  Warren P. Seering,et al.  The Professionalization of Risk Management: What Role can the ISO 31000 Risk Management Principles Play? , 2016 .

[21]  Eddie W.L. Cheng,et al.  Exploring the perceived influence of safety management practices on project performance in the construction industry , 2012 .

[22]  Albert P.C. Chan,et al.  Fuzzy set theory approach for measuring the performance of relationship-based construction projects in Australia , 2012 .

[23]  Bjørn Andersen,et al.  “Need for Speed”: Framework for Measuring Construction Project Pace – Case of Road Project☆ , 2016 .

[24]  Paul S. Royer Risk Management: The Undiscovered Dimension of Project Management , 2000 .

[25]  Mohamed Sayed Bassiony Ahmed Abd El-Karim,et al.  Identification and assessment of risk factors affecting construction projects , 2017 .

[26]  Beliz Ozorhon,et al.  Impact of integration management on construction project management performance , 2017 .

[27]  C. Florio,et al.  Enterprise risk management and firm performance: The Italian case , 2017 .

[28]  I. Ali,et al.  Project governance, benefit management, and project success: Towards a framework for supporting organizational strategy implementation , 2017 .

[29]  Low Sui Pheng,et al.  Environmental factors and work performance of project managers in the construction industry , 2006 .

[30]  José Manuel Galán,et al.  Beyond Earned Value Management: A Graphical Framework for Integrated Cost, Schedule and Risk Monitoring☆ , 2013 .

[31]  Craig Langston,et al.  Development of generic key performance indicators for PMBOK® using a 3D project integration model , 2013 .

[32]  Siba Sankar Mahapatra,et al.  Fuzzy based risk assessment module for metropolitan construction project: An empirical study , 2017, Eng. Appl. Artif. Intell..

[33]  Joy Debnath,et al.  Risk Analysis in Construction Sites Using Fuzzy Reasoning and Fuzzy Analytic Hierarchy Process , 2013 .

[34]  Wei Tong Chen,et al.  Earned value project management: Improving the predictive power of planned value , 2016 .

[35]  Terje Aven,et al.  On the new ISO guide on risk management terminology , 2011, Reliab. Eng. Syst. Saf..

[36]  Terje Aven,et al.  On how to define, understand and describe risk , 2010, Reliab. Eng. Syst. Saf..

[37]  DattaSaurav,et al.  Fuzzy based risk assessment module for metropolitan construction project , 2017 .

[38]  Hamdu Kedir Mohammed,et al.  The Impact of Total Risk Management on Company's Performance☆ , 2016 .

[39]  David Bryde,et al.  Conditions of success for earned value analysis in projects , 2017 .