A bilevel decomposition algorithm for simultaneous production scheduling and conflict-free routing for automated guided vehicles

We address a bilevel decomposition algorithm for solving the simultaneous scheduling and conflict-free routing problems for automated guided vehicles. The overall objective is to minimize the total weighted tardiness of the set of jobs related to these tasks. A mixed integer formulation is decomposed into two levels: the upper level master problem of task assignment and scheduling; and the lower level routing subproblem. The master problem is solved by using Lagrangian relaxation and a lower bound is obtained. Either the solution turns out to be feasible for the lower level or a feasible solution for the problem is constructed, and an upper bound is obtained. If the convergence is not satisfied, cuts are generated to exclude previous feasible solutions before solving the master problem again. Two types of cuts are proposed to reduce the duality gap. The effectiveness of the proposed method is investigated from computational experiments.

[1]  Vipul Jain,et al.  Algorithms for Hybrid MILP/CP Models for a Class of Optimization Problems , 2001, INFORMS J. Comput..

[2]  R. Saravanan,et al.  Simultaneous scheduling of parts and automated guided vehicles in an FMS environment using adaptive genetic algorithm , 2006 .

[3]  J. F. Benders Partitioning procedures for solving mixed-variables programming problems , 1962 .

[4]  Andrew Kusiak Material handling in flexible manufacturing systems , 1985 .

[5]  Masahiro Inuiguchi,et al.  Lagrangian relaxation with cut generation for hybrid flowshop scheduling problems to minimize the total weighted tardiness , 2010, Comput. Oper. Res..

[6]  Gündüz Ulusoy,et al.  A genetic algorithm approach to the simultaneous scheduling of machines and automated guided vehicles , 1997, Comput. Oper. Res..

[7]  P. Lacomme,et al.  Simultaneous job input sequencing and vehicle dispatching in a single-vehicle automated guided vehicle system: a heuristic branch-and-bound approach coupled with a discrete events simulation model , 2005 .

[8]  Semra Tunali Evaluation of alternate routing policies in scheduling a job-shop type FMS , 1997 .

[9]  Ronald Mantel,et al.  Design and operational control of an AGV system , 1995 .

[10]  Mohammad Abdollahi Azgomi,et al.  Conflict-free scheduling and routing of automated guided vehicles in mesh topologies , 2009, Robotics Auton. Syst..

[11]  Chelliah Sriskandarajah,et al.  Design and operational issues in AGV-served manufacturing systems , 1998, Ann. Oper. Res..

[12]  Gündüz Ulusoy,et al.  A Time Window Approach to Simultaneous Scheduling of Machines and Material Handling System in an FMS , 1995, Oper. Res..

[13]  Ted K. Ralphs,et al.  Decomposition and Dynamic Cut Generation in Integer Linear Programming , 2006, Math. Program..

[14]  J. M. A. Tanchoco,et al.  Conflict-free shortest-time bidirectional AGV routeing , 1991 .

[15]  Jacques F. Benders,et al.  Partitioning procedures for solving mixed-variables programming problems , 2005, Comput. Manag. Sci..

[16]  André Langevin,et al.  Integrated production and material handling scheduling using mathematical programming and constraint programming , 2003, Eur. J. Oper. Res..

[17]  Gerd Finke,et al.  Vehicle scheduling in two-cycle flexible manufacturing systems , 1994 .

[18]  Manoj Kumar Tiwari,et al.  Intelligent agent framework to determine the optimal conflict-free path for an automated guided vehicles system , 2002 .

[19]  I. Grossmann,et al.  A Decomposition Method for the Simultaneous Planning and Scheduling of Single-Stage Continuous Multiproduct Plants , 2006 .

[20]  André Langevin,et al.  Scheduling and routing of automated guided vehicles: A hybrid approach , 2007, Comput. Oper. Res..

[21]  John N. Hooker,et al.  Planning and Scheduling by Logic-Based Benders Decomposition , 2007, Oper. Res..

[22]  Masahiro Inuiguchi,et al.  A Decomposition Method for Production Scheduling and AGV Routing Problems by Lagrangian Relaxation with Cut Generation , 2007 .

[23]  MengChu Zhou,et al.  Modeling and deadlock avoidance of automated manufacturing systems with multiple automated guided vehicles , 2005, IEEE Transactions on Systems, Man, and Cybernetics, Part B (Cybernetics).

[24]  Tatsushi Nishi,et al.  Distributed route planning for multiple mobile robots using an augmented Lagrangian decomposition and coordination technique , 2005, IEEE Transactions on Robotics.

[25]  Mariagrazia Dotoli,et al.  Coloured timed Petri net model for real-time control of automated guided vehicle systems , 2004 .

[26]  Iris F. A. Vis,et al.  Survey of research in the design and control of automated guided vehicle systems , 2006, Eur. J. Oper. Res..

[27]  J. Hooker,et al.  Logic-based Benders decomposition , 2003 .