Maximizing throughput by evaluating critical utilization paths
暂无分享,去创建一个
Recently the relationship between batch structure, bottleneck machine and maximum throughput has been explored for serial, convergent and divergent process configurations consisting of two machines and three processes. In three of the seven possible configurations a multiple batch structure maximizes time-constrained throughput. The principle of scheduling a bottleneck. Critical utilization paths provide a convenient vehicle to evaluate multiple batch structures by means of integer programming. Also the quality of existing heuristic procedures can be evaluated in this way.
[1] Eliyahu M. Goldratt,et al. Computerized shop floor scheduling , 1988 .
[2] P. J. Weeda,et al. Maximizing throughput in some simple time-constrained scheduling situations , 1990 .
[3] P. J. Weeda. On the choice of batch mode in order to maximize throughput , 1990 .