Controlled blasting for long term stability of pit-walls

Abstract Controlled blasting techniques were used to control over-breaks and to aid in the stability of the remaining rock mass at Rampura Agucha open-pit mine in India. The mine is a lead zinc mine producing 5.95 mtpa of ore and has recently started its underground part, which is slated to produce 4.5 mtpa of ore in near future. The mine is currently working at 260 m depth, and is designed to reach a depth of 372 m. During blasting, back break was the main concern as despite of carrying out pre-splitting; the benches experienced back breaks adversely affecting the stability of the remaining walls. Normal production blast consists of detonation of 6–8 rows involving 140–200 holes in a blast round. A master plan of the pre-split holes position at spacing of 1.2 m was prepared. The available explosive was in the cartridge diameter of 25 mm which provided decoupling ratio of 1:3.6. Each bench of footwall and of all stages of hang wall is pre-splitted to minimize damage to the rock mass. Pre-split holes of about 700,000 m are being drilled annually to get desired pit slopes. In the experimental trials the mouths of the pre-split holes were left without explosives from 0.8 to 2.7 m. In the latter stage the inclined holes of 115 mm at 80°, 70° and 60° were experimented. The pre-split holes drilled at 1.2 m spacing with 60° inclination on footwall and 70° on hangwall yielded desired results.

[1]  D. P. Blair,et al.  Seismic radiation from an explosive column , 2010 .

[2]  William L. Fourney,et al.  Controlled blasting with ligamented charge holders , 1978 .

[3]  Mats Olsson,et al.  Towards new Swedish recommendations for cautious perimeter blasting , 2002 .

[4]  Katsuhiko Kaneko,et al.  Dynamic Fracture Process Analysis Of Rock Subjected To Stress Wave And Gas Pressurization , 2004 .

[5]  Finn Ouchterlony,et al.  Perimeter blasting in granite with holes with axial notches and radial bottom slots , 2000 .

[6]  L. Guojun L. Rui Blasting of a reinforced concrete chimney in a high position and in a complex environment , 2012 .

[7]  S. Olofsson Applied Explosives Technology for Construction and Mining , 1988 .

[8]  G. F. Smith,et al.  The detection of blast damage by borehole pressure measurement , 2000 .

[9]  W Adamson Reflections on the functionality of pre-split blasting for wall control in surface mining , 2012 .

[10]  M. N. Toksöz,et al.  Secondary Shear Waves From Source Boreholes , 1993 .

[11]  Yuichi Nakamura Model experiments on effectiveness of fracture plane control methods in blasting , 1999 .

[12]  Frédéric Vanbrabant,et al.  P and S Mach Waves Generated by the Detonation of a Cylindrical Explosive Charge – Experiments and Simulations , 2002 .

[13]  B. Mohanty,et al.  Explosion generated fractures in rock and rock-like materials , 1990 .

[14]  Mats Olsson,et al.  What Causes Cracks in Rock Blasting , 2002 .

[15]  C Ryu,et al.  Assessment of blast-induced damaged zone and its control , 2012 .

[16]  William L. Fourney,et al.  Fracture initiation and propagation from a center of dilatation , 1975, International Journal of Fracture.

[17]  R. Sengbush,et al.  SHEAR WAVES FROM EXPLOSIVE SOURCES , 1963 .

[18]  S. J. Patrick Aidan Heelan,et al.  RADIATION FROM A CYLINDRICAL SOURCE OF FINITE LENGTH , 1953 .

[19]  D. P. Blair,et al.  A comparison of Heelan and exact solutions for seismic radiation from a short cylindrical charge , 2007 .

[20]  P Dare-Bryan,et al.  Blast optimisation through computer modelling of fragmentation, heave and damage , 2012 .

[21]  Chuen Hon Cheng,et al.  Synthetic full waveform acoustic logs in cased boreholes , 1984 .

[22]  R. Balachander,et al.  Pre-split blasting for final wall control in a nuclear power project , 2012 .