A computer simulation approach to evaluating assembly line balancing with variable operation times
暂无分享,去创建一个
[1] Jacob Rubinovitz,et al. A weighted approach for assembly line design with station paralleling and equipment selection , 2003 .
[2] Ramazan Yaman. An assembly line design and construction for a small manufacturing company , 2008 .
[3] Cathal Heavey,et al. On the workload and 'phaseload' allocation problems of short reliable production lines with finite buffers , 2005, Comput. Ind. Eng..
[4] Ray Wild,et al. A note on the operating characteristics of‘ balanced’ and ‘ unbalanced’ production flow lines , 1972 .
[5] Kut C. So,et al. Some data for applying the bowl phenomenon to large production line systems , 1993 .
[6] Diomidis Spinellis,et al. Large production line optimization using simulated annealing , 2000 .
[7] Syed H. Masood. Line balancing and simulation of an automated production transfer line , 2006 .
[8] Kelvin C. W. So,et al. The effect of the coefficient of variation of operation times on the allocation of storage space in , 1991 .
[9] Wen-Chyuan Chiang,et al. An optimal piecewise-linear program for the U-line balancing problem with stochastic task times , 2006, Eur. J. Oper. Res..
[10] Frederick S. Hillier,et al. On the optimal design of tandem queueing systems with finite buffers , 1995, Queueing Syst. Theory Appl..
[11] F. Hillier,et al. On the Optimal Allocation of Work in Symmetrically Unbalanced Production Line Systems with Variable Operation Times , 1979 .
[12] Sabry Shaaban,et al. Improving the efficiency of unpaced production lines by unbalancing service time means , 2009 .
[13] M. M. Nkasu,et al. A stochastic approach to assembly line balancing , 1995 .
[14] P. De La Wyche,et al. The Design of Imbalanced Series Queue Flow Lines , 1977 .
[15] Ray Wild,et al. The nonsteady-state performance of unpaced manual assembly lines , 1980 .
[16] R. Pike,et al. The bowl phenomenon in unpaced lines , 1994 .
[17] Horst Tempelmeier,et al. Practical considerations in the optimization of flow production systems , 2003 .
[18] Kut C. So,et al. On the efficiency of unbalancing production lines , 1989 .
[19] Nori Prakasa Rao,et al. On the mean production rate of a two-stage production system of the tandem type , 1975 .
[20] Alberto Portioli-Staudacher,et al. Integrating inspection-policy design in assembly-line balancing , 2006 .
[21] H. L. Ong,et al. A bidirectional heuristic for stochastic assembly line balancing Type II problem , 2005 .
[22] N. P. Rao. Two-Stage Production Systems with Intermediate Storage , 1975 .
[23] Hon-Shiang Lau,et al. A decision support system for the design of unpaced production lines , 1986 .
[24] Nori Prakasa Rao,et al. A generalization of the ‘bowl phenomenon’ in series production systems , 1976 .
[25] Rob Pooley,et al. Simulation as a Means of Solving the Buffer Capacity Problem for Flow Line Production , 1997 .
[26] William C. Perkins,et al. Stochastic unpaced line design: Review and further experimental results , 1985 .
[27] Hon-Shiang Lau,et al. Allocating work to a two-stage production system with interstage buffer , 1994 .
[28] Diomidis Spinellis,et al. Analysis and Design of Discrete Part Production Lines , 2009, Optimization and its applications.
[29] Frederick S. Hillier,et al. Toward characterizing the optimal allocation of storage space in production line systems with variable processing times , 1993 .