Frequency of time overrun causes in road construction in Palestine: Contractors' View

Time, cost and quality have their proven importance as the prime measures for project success. However, the history of the construction industry worldwide is full of projects that were completed with significant time and cost overruns. This study is conducted to investigate the occurrence frequency of time over run causes in road construction projects in the West Bank in Palestine from contractors’ viewpoint through a questionnaire survey. The field survey included 34 contractors. 52 factors affecting time overrun were identified during the research. The survey concluded that the top ten frequent factors are: segmen

[1]  Henry F. W. Naylor Construction Project Management: Planning and Scheduling , 1995 .

[2]  G. O. Jagboro,et al.  The effects of construction delays on project delivery in Nigerian construction industry , 2002 .

[3]  Sherif Ali Mohtady Mohamed,et al.  Factors affecting the performance of construction projects in the Gaza Strip , 2009 .

[4]  S. Keoki. Sears,et al.  Construction Project Management , 1972 .

[5]  Chabota Kaliba,et al.  Cost escalation and schedule delays in road construction projects in Zambia , 2009 .

[6]  Fetene Nega CAUSES AND EFFECTS OF COST OVERRUN ON PUBLIC BUILDING CONSTRUCTION PROJECTS IN ETHIOPIA , 2008 .

[7]  Amund Bruland,et al.  Cost diviation in road construction projects: The case of Palestine , 2012 .

[8]  Jomah Mohammed Al-najjar,et al.  Factors Influencing Time and Cost Overruns on Construction Projects in the Gaza Strip , 2008 .

[9]  Koleola Tunwase Odusami,et al.  Significant Factors Causing Cost Overruns in Telecommunication Projects in Nigeria , 2010 .

[10]  Martin Skitmore,et al.  Causes of delays in Saudi Arabian public sector construction projects , 2009 .

[11]  Sadi Assaf,et al.  Causes of delay in large construction projects , 2006 .

[12]  Ayman H. Al-Momani,et al.  Construction delay: a quantitative analysis , 2000 .

[13]  Ibrahim Mahamid,et al.  Risk matrix for factors affecting time delay in road construction projects: owners' perspective , 2011 .

[14]  N. Kartam,et al.  Delays and cost increases in the construction of private residential projects in Kuwait , 2005 .

[16]  A. M. Odeh,et al.  Causes of construction delay: traditional contracts , 2002 .

[17]  Sameh M. El-Sayegh,et al.  Significant factors causing delay in the UAE construction industry , 2006 .