Cycle time simulation study for cluster tool operation in IC fabrication
暂无分享,去创建一个
[1] Niranjan Chandrasekaran,et al. Operational Models for Evaluating the Impact of Process Changes on Cluster Tool Performance , 2000 .
[2] Todd LeBaron,et al. Using simulation to understand capacity constraints and improve efficiency on process tools , 2002, Proceedings of the Winter Simulation Conference.
[3] R. S. Gyurcsik,et al. Single-wafer cluster tool performance: an analysis of the effects of redundant chambers and revisitation sequences on throughput , 1996 .
[4] Raghavan Srinivasan,et al. Modeling and performance analysis of cluster tools using Petri nets , 1998 .
[5] M. A. Dimmler. Using simulation and genetic algorithms to improve cluster tool performance , 1999 .
[6] E. A. MacNair,et al. Application of cluster tool modeling to a 300 mm fab simulation , 2003, Proceedings of the 2003 Winter Simulation Conference, 2003..
[7] Marvin S. Seppanen,et al. Evaluation of cluster tool throughput for thin film head production , 1999, WSC '99.
[8] Averill M. Law,et al. Simulation Modeling and Analysis , 1982 .
[9] Todd LeBaron,et al. The simulation of cluster tools: a new semiconductor manufacturing technology , 1994, Proceedings of Winter Simulation Conference.
[10] R. S. Gyurcsik,et al. Single-wafer cluster tool performance: an analysis of throughput , 1994 .
[11] Todd LeBaron,et al. Using emulation to validate a cluster tool simulation model , 2000, 2000 Winter Simulation Conference Proceedings (Cat. No.00CH37165).
[12] Wlodzimierz M. Zuberek,et al. Timed Petri nets in modeling and analysis of cluster tools , 2001, IEEE Trans. Robotics Autom..