Influence of the Maximum Flow Ramping Rates on the Water Value

[1]  Javier García-González,et al.  Water value in electricity markets , 2016 .

[2]  Juan I. Pérez-Díaz,et al.  Effects of the maximum flow ramping rates on the long-term operation decisions of a hydropower plant , 2014 .

[3]  J. R. Wilhelmi,et al.  Assessment of the economic impact of environmental constraints on annual hydropower plant operation , 2013, Energy Policy.

[4]  J. Bogardi,et al.  Dynamic Programming Based Operation of Reservoirs: Applicability and Limits , 2013 .

[5]  Juan I. Pérez-Díaz,et al.  Assessment of the economic impact of environmental constraints on short-term hydropower plant operation , 2010 .

[6]  Lea-Rachel D. Kosnik,et al.  Balancing Environmental Protection and Energy Production in the Federal Hydropower Licensing Process , 2008, Land Economics.

[7]  O.B. Fosso,et al.  Short-term hydro scheduling in a liberalized power system , 2004, 2004 International Conference on Power System Technology, 2004. PowerCon 2004..

[8]  Antonio J. Conejo,et al.  Self-Scheduling of a Hydro Producer in a Pool-Based Electricity Market , 2002, IEEE Power Engineering Review.

[9]  Richard N. Palmer,et al.  Value of Seasonal Flow Forecasts in Bayesian Stochastic Programming , 1997 .

[10]  O. Nilsson,et al.  Hydro unit start-up costs and their impact on the short term scheduling strategies of Swedish power producers , 1997 .

[11]  R. Cushman Review of Ecological Effects of Rapidly Varying Flows Downstream from Hydroelectric Facilities , 1985 .

[12]  Ian C. Goulter,et al.  Practical implications in the use of stochastic dynamic programming for reservoir operation , 1985 .

[13]  Judith Gurney BP Statistical Review of World Energy , 1985 .

[14]  W. Yeh,et al.  Optimization of real time operation of a multiple-reservoir system , 1974 .

[15]  Y. Larsson,et al.  Incremental Cost of Water Power , 1961, Transactions of the American Institute of Electrical Engineers. Part III: Power Apparatus and Systems.

[16]  J. M. Ukwejeh,et al.  Use of Storage Water in a Hydroelectric System , 2013 .

[17]  G. Andersson,et al.  Approach of Integrating Ancillary Services into a medium-term Hydro Optimization , 2012 .

[18]  Nations United,et al.  Earth Summit, Agenda 21 : Programme of Action for Sustainable Development , 1992 .

[19]  J. Stedinger,et al.  Algorithms for Optimizing Hydropower System Operation , 1985 .

[20]  H. Akaike,et al.  Information Theory and an Extension of the Maximum Likelihood Principle , 1973 .