An FCM-Based Dynamic Modelling of Integrated Project DeliveryImplementation Challenges in Construction Projects
暂无分享,去创建一个
Taha Mansouri | Ehsan Saghatforoush | Ahad Zareravasan | Zahra Kahvandi | Ehsan Saghatforoush | Taha Mansouri | Ahad Zareravasan | Zahra Kahvandi
[1] Ehsan Saghatforoush,et al. Integrated Project Delivery (IPD) Research Trends. , 2017 .
[2] Ron Basu,et al. Case study: A fresh approach of the Balanced Scorecard in the Heathrow Terminal 5 project , 2009 .
[3] Keith R. Molenaar,et al. Exploring performance of the integrated project delivery process on complex building projects , 2016 .
[4] Burcin Becerik-Gerber,et al. Understanding Construction Industry Experience and Attitudes toward Integrated Project Delivery , 2010 .
[5] Pardis Pishdad-Bozorgi,et al. A Schema of Trust Building Attributes and Their Corresponding Integrated Project Delivery Traits , 2016 .
[6] Andrew R.J. Dainty,et al. Construction supply chain integration: an elusive goal? , 2005 .
[7] John B. Bowles,et al. Using Fuzzy Cognitive Maps as a System Model for Failure Modes and Effects Analysis , 1996, Inf. Sci..
[8] Awad S. Hanna,et al. Evaluating integrated project delivery using the project quarterback rating , 2016 .
[9] Elpiniki I. Papageorgiou,et al. A Novel Approach on Constructed Dynamic Fuzzy Cognitive Maps Using Fuzzified Decision Trees and Knowledge-Extraction Techniques , 2010 .
[10] Benjamin F. Hobbs,et al. FUZZY COGNITIVE MAPPING AS A TOOL TO DEFINE MANAGEMENT OBJECTIVES FOR COMPLEX ECOSYSTEMS , 2002 .
[11] Christopher S. Lee. Implementation of Integrated Project Delivery on Department of Navy Military Construction Projects , 2013 .
[12] Michael Glykas. Fuzzy Cognitive Maps: Advances in Theory, Methodologies, Tools and Applications , 2010 .
[13] Keith D. Hampson,et al. Digital Modeling, Integrated Project Delivery and Industry Transformation: An Australian Case Study , 2014 .
[14] Farook Hamzeh,et al. Implementation of IPD in the Middle East and its Challenges , 2014 .
[15] H. Eskandari,et al. A fast Pareto genetic algorithm approach for solving expensive multiobjective optimization problems , 2008, J. Heuristics.
[16] Lianying Zhang,et al. Risk/Reward Compensation Model for Integrated Project Delivery , 2014 .
[17] Roger Atkinson,et al. Project management: cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria , 1999 .
[18] Iman Nejati,et al. Feasibility of Using an Integrated Project Delivery (IPD) in Mass Housing Collaborative Projects , 2014 .
[19] Ben F. Bigelow,et al. Comparison of Construction Manager at Risk and Integrated Project Delivery Performance on Healthcare Projects: A Comparative Case Study , 2015 .
[20] Bart Kosko,et al. Fuzzy Cognitive Maps , 1986, Int. J. Man Mach. Stud..
[21] Andrew Davies,et al. From hero to hubris – Reconsidering the project management of Heathrow’s Terminal 5 , 2010 .
[22] Pardis Pishdad-Bozorgi,et al. Case Studies on the Role of Integrated Project Delivery (IPD) Approach on the Establishment and Promotion of Trust , 2017 .
[23] Adel Al Subaih. Integrated Project Delivery: A Paradigm Shift for Oil and Gas Projects in the UAE and the Middle East Region , 2015 .
[24] Jose L. Salmeron,et al. Dynamic risks modelling in ERP maintenance projects with FCM , 2014, Inf. Sci..
[25] Burcin Becerik-Gerber,et al. Transitioning to Integrated Project Delivery: Potential barriers and lessons learned , 2011 .
[26] Joel Darrington. Using a design-build contract for Lean Integrated Project Delivery , 2011 .
[27] Vernon D. Miller,et al. Assessing key dimensions to effective innovation implementation in interorganizational project teams: an Integrated Project Delivery case , 2014 .
[28] Ahad Zare Ravasan,et al. A FCM-Based Dynamic Modeling of ERP Implementation Critical Failure Factors , 2014, Int. J. Enterp. Inf. Syst..
[29] Burcin Becerik-Gerber,et al. Implementation of Integrated Project Delivery and Building Information Modeling on a Small Commercial Project , 2010 .
[30] Elpiniki I. Papageorgiou,et al. Application of fuzzy cognitive maps for cotton yield management in precision farming , 2009, Expert Syst. Appl..
[31] Witold Pedrycz,et al. Expert-Based and Computational Methods for Developing Fuzzy Cognitive Maps , 2010 .
[32] Iris D. Tommelein,et al. Energy-Related Risk Management in Integrated Project Delivery , 2013 .
[33] Mohammad Fadhil Mohammad,et al. Barriers and Impact of Mechanisation and Automation in Construction to Achieve Better Quality Products , 2016 .
[34] Renee Cheng,et al. Motivation and Means: How and Why IPD and Lean Lead to Success , 2016 .
[35] Geert P.M.R. Dewulf,et al. The interplay between formal and informal contracting in integrated project delivery , 2015 .
[36] A. Davies,et al. Procuring Complex Performance in Construction: London Heathrow Terminal 5 And a Private Finance Initiative Hospital , 2009 .
[37] Elpiniki I. Papageorgiou,et al. A new methodology for Decisions in Medical Informatics using fuzzy cognitive maps based on fuzzy rule-extraction techniques , 2011, Appl. Soft Comput..
[38] Badr Haque. Problems in concurrent new product development: an in‐depth comparative study of three companies , 2003 .
[39] Pardis Pishdad-Bozorgi,et al. Symbiotic Relationships between Integrated Project Delivery (IPD) and Trust , 2016 .
[40] Benedict D. Ilozor,et al. Building Information Modeling and Integrated Project Delivery in the Commercial Construction Industry: A Conceptual Study , 2012 .
[41] William A. Lichtig,et al. The Integrated Agreement for Lean Project Delivery , 2010 .
[42] Mohd Nasrun Mohd Nawi,et al. Improving construction industry through Integrated Project Delivery (IPD) , 2015 .
[43] Amanda Fish. Integrated project delivery: the obstacles of implementation , 2011 .
[44] Judy A. Kraatz,et al. Modelling, collaboration and integration : a case study for the delivery of public buildings , 2013 .
[45] Lianying Zhang,et al. Sharing Tacit Knowledge for Integrated Project Team Flexibility: Case Study of Integrated Project Delivery , 2013 .