Cost justification of the new Ohio Edison Company's energy management system

The authors discuss a systematic method for analyzing alternative strategies that the Ohio Edison (OE) Company used during the feasibility study of its energy management system (EMS). The primary objectives were to develop requirements, cost estimates, benefits, and an overall plan for a system control center computer upgrade to meet OE's needs through the year 2009. A key element in the requirements study of an energy management system was determining the value of not only the present system, but also of several feasible alternatives in terms of present worth dollars. The term value represents the difference between a system's benefits, or the loss of those benefits, and its cost. When the values of various alternatives are compared over time with that of the existing system, the most cost-effective point for system replacement can be accurately defined along with the best alternatives with varying degrees of implementation costs, and resulting benefits could be evaluated. >

[1]  R.D. Masiello,et al.  Cost-Benefit Justification of an Energy Control Center , 1981, IEEE Transactions on Power Apparatus and Systems.

[2]  V. F. Carvalho,et al.  Assessment of Real-Time Optimal Voltage Control , 1986, IEEE Transactions on Power Systems.

[3]  W. R. Barcelo,et al.  Optimization of the real-time dispatch with constraints for secure operation of bulk power systems , 1977, IEEE Transactions on Power Apparatus and Systems.

[4]  M. Telson,et al.  The Economies of Alternative Levels of Reliability for Electric Power Generation Systems , 1975 .